Colorado Center Bicycle/Pedestrian Bridge Over I-25
Engineering Division - Contract No. 201312517

Colorado Center Bicycle/Pedestrian Bridge Over I-25
Project Funding Number   PJ00909_001

General Statement of Work

The Work generally consists of the design, fabrication, painting and erection of a simple span, steel combined arch and truss pedestrian bridge with a reinforced concrete deck spanning over Interstate 25, and associated approach ramps.  The main span over I-25 is over 300 feet in length.  The approach ramps will be prestressed concrete box girders.  The Work also includes utility work and coordination, storm sewer installation, roadway work, signage and stripping, lighting, coordination with the public and the project neighbors, and all traffic control necessary to construct the project.

Addendum
Statement of Quantities
Sign in sheet 

Addenda 2

Prebid on 9/26/2013 at  2:00 PM
Room 4.I.4.
201 W. Colfax Ave.
Denver, CO 80202

Bid Opening on 10/25/2013 at 11:00 AM
1st Floor Conference Room - 1.D.1
201 W. Colfax Ave.
Denver, CO 80202

Plans Available September 18, 2013:
Digital Download
eBid No. 2879135,  
Plan Cost $10.00

Project Manager: Jim Geist  Phone: (720) 913-4504  

Contract Administrator: JoAnn Phillips Phone: (720) 913-8524  

DBE goal: 8%

FOR COMPLETE DESCRIPTION SEE AD IN The Daily Journal ON THE FOLLOWING DATES:
Wednesday, September 18, 2013
Thursday, September 19, 2013
Friday, September 20, 2013


Posted on Sep 18, 2013 (Archive on Nov 17, 2013)
Posted by Manager  Contributed by Manager