2014 Critical Sewer Lining
Wastewater Management Division - Contract No. 201313310

2014 Critical Sewer Lining
Project Funding Number   PZ71812_126

General Statement of Work A (3) yearlong contract for emergency rehabilitation of Sewer facilities with structural deterioration problems, using Wastewater Management Division’s approved cured-in-place liner method of construction.  All work will be initiated through written work requests issued by the City Project Manager. Work may also include manhole lining as detailed in section 15 

of the Storm Drainage and Sanitary Sewer Construction Detail and Technical Specifications.  Response to the Project Manager is required within 24 hours.

Addendum One
Statement of Quanities
Sign in Sheet

Prebid on 11/13/2013 at  2:00 PM
Room 4.I.5
201 W. Colfax Ave.
Denver, CO 80202

Bid Opening on 12/5/2013 at 11:00 AM
1st Floor Conference Room - 1.D.1
201 W. Colfax Ave.

Denver, CO 80202

Plans Available November 06, 2013:
Digital Download
QUESTCDN NO: 2976797
Plan Cost $10.00

Project Manager: David Shaw Phone: (303) 446-3456  
Contract Administrator: JoAnn Phillips Phone: (720) 913-8524  

M/WBE 6%

FOR COMPLETE DESCRIPTION SEE AD IN The Daily Journal ON THE FOLLOWING DATES:
Tuesday, November 06, 2013
Wednesday, November 07, 2013

Thursday, November 08, 2013

THE FOLLOWING PREQUALIFICATIONS ARE REQUIRED
1E(6) Sewer-Rehabilitation
$1,500,000.00


Posted on Nov 06, 2013 (Archive on Dec 07, 2013)
Posted by Manager  Contributed by Manager