|
|
Community Calendar
|
 |
|
View upcoming meetings of community interest sponsored by the Denver departments of Community Planning and Development, Parks and Recreation, and Public Works. Community Calendar
|
|
|
|
|
|
|
Customer Survey
|
 |
|
|
|
|
|
|
|
|
|
|
Fees
|
 |
|
Zoning (Links To Other Fees At Bottom)
The following fees are based on the Zoning Ordinance, Sec. 59-40, Schedule of fees to be charged. The Zoning Administrator may modify or waive the fees if these will result in unnecessary hardship due to exceptional or extraordinary circumstances.
The following fees shall be collected by the department prior to the filing of the following applications, or issuance of permits and certificates.
For purposes of calculating fees, any fraction of an acre shall be rounded up to the nearest whole acre.
The cost of "zoning permits for construction and use" is based on the valuation of the improvements proposed.
Once paid, no refund of fees will be made.
Checks should be made out to the Manager of Finance.
| Application/Permit |
Basic Fee |
Additional fee |
| Construction & Use Permit |
| Construction Valuation $1 to $500 |
$10 |
N/A |
| Construction Valuation $501 to $2,000 |
$25 |
N/A |
| Construction Valuation $2,001 to $50,000 |
$35 |
$0.50 per $1,000 in additional valuation, or fraction thereof |
| Construction Valuation $50,001 to $100,000 |
$100 |
| Construction Valuation Over $100,000 |
$150 |
| Other, Permits, Certificates, and Administrative Reviews |
| Sign permit |
$25 |
N/A |
Telecommunications permit, See Construction and Use Permit above |
By Valuation |
Valuation Fee + $100 Design Review |
| Home Occupation permit |
$20 |
N/A |
| Certificate of occupancy--temporary |
-0- |
N/A |
| Use by temporary permit, certificate |
$10 |
N/A |
| Administrative reviews: Overheight fence, A/C unit in setback, RV over 22 feet long |
$100 |
N/A |
| Zone lot amendment |
$50 |
N/A |
| Site Plan Review |
| Industrial Site Plan |
$250 |
N/A |
| Parking area landscape plan |
$250 |
N/A |
| Site plans (DP) |
$500 if 1 acre or less |
Continued below |
| Site plans (PD, PBG, PUD) |
$1,000 if 1 acre or less |
maximum of $50,000 |
| Site plans (DP, PD, PBG, PUD) |
$2,500 if more than 1 acre |
$500 for each additional acre maximum of $50,000 |
Redline changes to a site plan Note: must meet criteria |
$100 |
N/A |
| Zoning Map Amendments (Rezoning) |
Standard Note: includes cost of required publications and signs for posting. |
$1,000 for 1st acre |
$500 for each additional acre, maximum of $50,000
|
with Waivers or Conditions Note: includes cost of required publications and signs for posting. |
$1,500 for 1st acre |
Plus $600 for each additional acre, maximum of $50,000 |
Planned Unit Development Note: includes cost of required publications and signs for posting. |
$1,000 Under 1 acre |
Continued below |
| PUD continued |
$1,500 for 1 full acre
|
$500 per each additional acre, maximum of $50,000 |
| Language Amendment |
| Ordinance Language amendment Note: includes cost of required publications |
$500 |
N/A |
| Subdivision Fee |
| Fee with site plan |
$500 for 1st acre |
plus $100 for each additional acre |
| Fee with no site plan |
$1,500 for 1st acre |
plus $100 for each additional acre |
The following fees shall be based on reasonable costs and expenses incurred by the department in assisting applicants.
- Platte River Valley Zone District. As required by 59-321 through 59-338
- Gateway District. As required by 59-341 through 59-352.
- administrative review. As required by 59-38(a)(12) and 59-22
- B-5 district. As required by sections 59-216 through 59-227
- Enumerated Overlay Districts. As required by article IV, division 21
- Inspections. As required by subsection 59-38(b)(1) of this chapter
The following are links to the Fee Schedules for plan review and permitting of land use and development in Denver.
|
|
|
|
|
|
|
|