Our street maintenance has not been keeping pace with our growth in population and traffic. Until recently, we've been trying to catch up on repairing potholes that were developing because we weren’t able to afford better and longer term maintenance solutions.
 
Now, bond funding will help move us in the right direction.  In addition to better maintenance, 1D will help increase traffic capacity in targeted areas, and help make Denver more pedestrian friendly and sustainable.

Photos

Tennyson St. - 26th to 32nd Ave.

 

Projects

Improvement Projects
Project Name
Click on the links below to be connected to a map of the project location, and brief facts about the project and its status

Bond Amount

                 Description

Phase 1 ImprovementsBond Map
Phase 2 Improvements Bond Map


$9,108,000


Install pedestrian improvements on Colfax and 14th between Speer and Bannock to implement plans to provide a green link between Civic Center and Speer.


Overview of the 14th Street Initiative
 

View 14th Street Project Design Video 
Windows Media Player
Quicktime Media Player
 

$10,350,000

Widen sidewalk and install pedestrian improvements on north side of 14th from Market to Colfax to provide an attractive and consistent gateway from Denver's major visitor facilities to Downtown.  Public/private partnership project. 
 

California St. Sidewalk/Streetscape Bond Map

$2,077,000

Install pedestrian improvements from 14th to 17th Streets to provide a consistent pedestrian environment for the link to the Colorado Convention Center and the 14th Street Better Denver Bond project.   

$2,277,000

Develop conceptual streetscape design for portions of Tennyson Street between 38th and 44th Avenues.

38th Avenue Underpass Bond Map

$2,588,000

Install improvements to enhance aesthetics and pedestrian use of this underpass. 

Cherry Creek Drive South
Phase 1 Improvements Bond Map

Phase 2 Improvements Bond Map
CCDS Corridor Plan 

$4,140,000

Reconstruction of a section of Cherry Creek Drive between South University Boulevard and South Colorado Boulevard. 

Repairs to the hopper unit.
 
Development of a Master Plan to support modifications.
 
Construction of an Office Annex.
 
Installation of a canopy cover for the salt storage facility.
 
Additions to the CCTS including Truck Transfer Facility
 
Additions to the Fleet Garage and Other Improvements

Colfax Avenue (West) - Enhanced Transit Corridor - Sheridan to Federal Bond Map

West Colfax Transportation Plan

$1,035,000

Moderate level of  improvements.  Potential improvements include upgrade existing medians, transit amenities at bus stops, and/or street crossing improvements

 
$3,105,000
 
 
 
 

$1,035,000

Moderate level of  improvements on approximately 21 blocks.  Potential improvements include upgrading existing medians, transit amenities at bus stops, and/or street crossing improvements
 

Provides for an additional 4 to 6 blocks of streetscaping to improve pedestrian access and bus ridership.

Public Infrastructure for Transit-Oriented Development - 38th and Blake Station Bond Map

$2,070,000

Provide basic infrastructure to large tract of vacant land adjacent to station.

Public Infrastructure for Transit-Oriented Development at Decatur Station Bond Map

$2,070,000

Provide basic connections to nearby low-income housing and Denver Human Services' offices.

Public Infrastructure for Transit-Oriented Development - 10th & Osage Bond Map

$518,000

Provide basic connections to the Central Line from existing neighborhood and also help facilitate transit oriented development (TOD).

Public Infrastructure for Transit-Oriented Development - Louisiana & Pearl Bond Map

$518,000

Provide basic connections to the Central Line from existing neighborhood and also help facilitate transit oriented development (TOD)

Public Infrastructure for Transit-Oriented Development - Southmoor Bond Project Page

$776,000

Provide basic connections to the Central Line from existing neighborhood and also help facilitate transit oriented development (TOD)

Yosemite Sound Wall Repair Bond Map

$518,000

Replace and/or repair sections of pre-cast concrete panels in the Yosemite sound wall to deter traffic noise from E. Kenyon to E. Oxford. 

 

$50,000,000

Reconstruction of asphalt arterial and collector streets in poor condition. There are approximately 43 street reconstruction projects which will receive bond-funding, however the list of projects is subject to change: 

 

$15,525,000

Adds 3rd northbound lane & widens all lanes to improve safety; new median and curb & gutter; transit stop improvements on high usage route

$30,000,000

New interchange with I-70 and Central Park Blvd, which is midway between Havana and Quebec in the Stapleton area.  This project will involve local and federal funding, as well as significant developer funding.

 

$3,105,000

This project would level out the hill to address safety issues along Quincy.

 

$2,070,000

Funding would add an additional northbound lane to correct lane imbalance between 5th and 7th Avenues, including bridge over US 6.  

TREX Finalization - Local Impacts

Phase 1: Buchtel West of University Improvements Bond Map

 

Phase 2: Buchtel East of University Improvements Bond Map

Phase 4: Oxford Improvements Bond Map 

Phase 3 and 4 (Boston/Oxford Improvements) project page  

$3,105,000

Provides for improved pedestrian access from neighborhoods to transit stations.

 

$1,035,000

Makes some pedestrian improvements along Hampden between Dahlia and Yosemite.

   
$3,900,000 Street maintenance including repair/replacement of select concrete panels and repair of curbs.

 