Preliminary Findings

Denver Public Works conducted a preliminary before (6/5/13) and after (11/13/13) study of the 15th Street Bikeway to understand how people are using the facility. The findings revealed that after the Bikeway was installed, the number of bicyclists on the corridor was slightly higher, and many more people were using the left side of 15th than before it was installed. Also, the number of bicyclists on the sidewalk was reduced by 61% after the Bikeway was installed.

Bike lane choice     # Bicyclists - before      # Bicyclists - after     
Left  62  399 
Lane #2  17 10 
Lane #3 15  13 
Right 255  75 
Sidewalk 145 56 
TOTAL 494 553 

In addition to this, Public Works collected responses from an online survey to understand how users feel about the corridor. After the Bikeway was installed, many more people used the facility on a daily basis. Most users felt that travel on 15th St improved with the installation of the Bikeway.



15th Infographic

Denver Public Works developed this infographic to describe the before and after conditions of 15th Street.

Feedback