In addition to the previous page of research information; the following information is a checklist of requirements for an Attic Finish or Dormer addtion to a single unit dwelling or duplex .
- This type of proposed construction is required to be "Logged In" at the Log in Counter(Green Flag) and can take a minimum of three weeks to complete the first review of plans and applications. Resubmittals of plans may be required to address code compliance and add to the overall timeline.
- Resubmittals/Plan Correction Notices
You may be required to modify your logged in plans to meet several specifications or you may be required to submit additional information if plans are incomplete. You may also receive a plan correction notice or a permit denial if your plans are in violation of the Building or Zoning Code. If you do not intend to appeal a plan correction notice, or chose not to go to the Board of Adjustment; you must submit all the required corrected plans with a completed "Resubmittal Form" to the Log in counter that comply with the code requirements. Always "cloud" the changes on the plans and notify the reviewer if there is a change from the original scope of work.
- Denver requires that plans accompany your permit application for several types of projects. Drawings or plans are helpful for even the most basic work and are often required for projects with a medium to high level of complexity. Detailed plans can help you avoid time-consuming and costly modifications prior to starting your project and may speed the permitting process. Drawings also assist contractors with the preparation of a complete and accurate cost estimate for your project. Information needed:
Who can obtain a permit?
- HOMEOWNER: Homeowner permits cannot be issued to LLC's, Trusts, Corporations, etc. Denver Assessor records shall have homeowner listed as a natural person. If permitting as a Homeowner, you MUST apply for permit in-person and provide Proof of Ownership or recorded Power of Attorney. If ownership information differs from Assessor Records due to a recent real estate purchase; provide copies of closing papers with the settlement page showing recording fees paid, other acceptable proof of ownership includes: recent Denver Property Tax Statement, or Recorded Deed. A Photo ID is required and will be verified at issuance of a Homeowner permit. Acceptable identification includes: a driver’s license or a non-driver’s ID issued by a State Department of Motor Vehicle.
- Keep in mind if pulling a homeowner's permit; you must comply with Policy 151.2, or a
- CONTRACTOR: Contractors must show proof of license by supplying one of the following: Original Denver contractor's license card (photocopies are not accepted), a company check, or a company credit card.
Administrative Modifications are a procedure recognizing that the Building Codes cannot anticipate every possible building project or construction situation. Go to Administrative Modification Guidelines to find out if this procedure will resolve project design issues without creating increased hazards to life/safety or property, and without compromising the intent of the code.
FEES: Building Permit Fee and Zoning Form 21 Fee.
After your plans are approved and the permit is ready to be issued; you will receive a label/s to take to the cashier for payment, an Inspection card and additional sheets of information. Calling in for an inspection is simple by following the Inspection Procedures, which will explain how to call in for an Inspection, a list of the inspection codes, and the Inspector's contact phone numbers.
Keep in mind that only the general construction of a project is covered under the 1R permit. There are separate permits required for other permit types.
|