Welcome to Work4Denver

On this site you will find information for bidding on upcoming construction projects, service opportunities, submit requests for proposals and qualifications, and access to valuable information to keep you informed of the procedures and processes for a successful bidding experience.  

Below is a list of current opportunities! 

Current Bidding Opportunities

Jan 28, 2015 (5 reads)

Project to replace the existing traffic signal on the Evans Ave Bridge at Santa Fe Dr. and the traffic sign bridge at S. Platte River Dr. south of Mississippi Ave.  The signal scope includes the removal of the existing traffic signal equipment – poles, signal, ped indications, controller and associated equipments- and replace with a new monotube traffic signal structure, street light traffic poles, pedestrian poles and equipment in accordance with the City and County of Denver and CDOT standards, i.e., new foundations, monotube structure, multiple 12-12-12 overhead indications, accessible pedestrian signals, video vehicle detection, controller/cabinet and thermoplastic pavement markings and signing in accordance to ASTM Type 11 retro reflective sheeting.  Sign bridge scope includes the removal of the existing cantilever sign structures and replace with, monotube sign structure that will be designed and constructed to CDOT standards.  The sign panels will be upgraded to the ASTM Type 11retro reflective sheeting.

Jan 27, 2015 (35 reads)

Concrete repairs, sealant replacements and traffic coating to half of the top level of the DPAC Parking Garage.

Jan 27, 2015 (34 reads)

Replace the Blake Street Bridge over 38th Street. This project will include removal of the Blake Street Bridge over the 38th Street Underpass, then replacing it at an elevation to provide 15.0 ft. clearance. Also requires modification of the adjacent roadway’s vertical curve to improve sight distance and accommodation of future widening of the 38th Street Underpass.

201520203 - Public Infrastructure (38th & Blake Station) TOD Sidewalks  Jan 22, 2015 (97 reads)
RFQ Professional Services for S Broadway Lincoln Corridor Study  Dec 18, 2014 (892 reads)
201419682 - Evergreen Bridge Replacement Over Bear Creek  Dec 16, 2014 (535 reads)
201419548 - 2015 Citywide ADA Ramp & Concrete Repairs Phase II  Dec 08, 2014 (547 reads)