Welcome to Work4Denver

On this site you will find information for bidding on upcoming construction projects, service opportunities, submit requests for proposals and qualifications, and access to valuable information to keep you informed of the procedures and processes for a successful bidding experience.  

Below is a list of current opportunities! 

Current Bidding Opportunities

Jan 27, 2015 (23 reads)

Concrete repairs, sealant replacements and traffic coating to half of the top level of the DPAC Parking Garage.

Jan 27, 2015 (22 reads)

Replace the Blake Street Bridge over 38th Street. This project will include removal of the Blake Street Bridge over the 38th Street Underpass, then replacing it at an elevation to provide 15.0 ft. clearance. Also requires modification of the adjacent roadway’s vertical curve to improve sight distance and accommodation of future widening of the 38th Street Underpass.

Jan 22, 2015 (91 reads)

The  “construction limits” for the Site are defined as Blake Street from 35th Street to 40th Street, 36th Street from Downing Street to Blake Street, Downing Street from Walnut Street to Blake Street, 40th Street from Walnut Street to Blake street and 38th Street from Delgany Street to Arkins Court.  Furthermore, the construction limits include cross streets as necessary to complete the project, and placement of signage on any street to be used for construction detours on the approved plans. All work shall occur within the City and County of Denver right-of-way.  Impacts to existing landscaping, concrete, sidewalk, structures, sprinklers, curbs, gutters, etc. that occur beyond the right-of-way will be repaired by the Contractor at their own expense.  Impacts to existing landscaping, concrete, sidewalk, structures, sprinklers, curbs, gutters, etc. that occur within the right-of-way, but are not specifically designated to be removed by the plans or by the Project Manger, will be repaired by the Contractor at their own expense. Contractor is responsible for coordinating construction activities with East Corridor project as required to complete work.

RFQ Professional Services for S Broadway Lincoln Corridor Study  Dec 18, 2014 (871 reads)
201419682 - Evergreen Bridge Replacement Over Bear Creek  Dec 16, 2014 (531 reads)
201419548 - 2015 Citywide ADA Ramp & Concrete Repairs Phase II  Dec 08, 2014 (545 reads)
201419442 - Union Pacific Yard Office  Dec 01, 2014 (984 reads)

Page 1 2


Feedback