Northeast District Central Control Improvements

Northeast District Central Control Improvements

Parks and Recreation - Contract No. 201207477
Northeast District Central Control Improvements
Project Funding Number   RJ03009_001

General Statement of Work
The Denver Parks Northeast District Central Control Improvements project is a combination of eight different park sites that will have the irrigation controllers upgraded to central control irrigation.  The sites are all located in the Northeast District of Denver Parks and go from Lowry Blvd up to Montebello.  The work will consist of installing new master valves and flow sensors at each point of connection for the parks irrigation system.  There will be work done on the backflows to accommodate new configurations and new mainline layouts.  The existing controllers at each park site will be removed and replaced with new central control equipment.  This will require trenching across the parks to install wires in some locations and installing new concrete pads for each controller.

Addendum One
Pre-bid Roster

Pre-bid on 9/5/2012 at 11:00 AM
1st Floor Conference Room - 1.D.1 
201 W Colfax Ave.  
Denver, CO 80202

Bid Opening on 9/20/12 at 11:00 AM
1st Floor Conference Room – 1.D.1
201 W. Colfax Ave.
Denver, CO 80202

Plans Available August 23, 2012:

Digital Download
Quest Project # 2228797
Plan Cost $10.00

Project Manager: Kent Sondgerath
Phone:    (720) 913-0636

Contract Administrator: Toni Green
Phone: (720) 913-4508  
 
M/WBE goal: 3.00%

FOR COMPLETE DESCRIPTION SEE AD IN The Daily Journal ON THE FOLLOWING DATES:
Thursday, August 23, 2012  
Friday, August 24, 2012  
Monday, August 27, 2012

THE FOLLOWING PREQUALIFICATIONS ARE REQUIRED
NONE


Posted on Aug 22, 2012 (Archive on Sep 21, 2012)
Posted by Manager  Contributed by Manager