Bear Creek Pedestrian Bridge

Bear Creek Pedestrian Bridge

Engineering Division - Contract No. 201207444
Bear Creek Pedestrian Bridge

Project Funding Number RH04407_502

General Statement of Work
This project is the third phase of the Bear Creek Trail construction projects between Sheridan and Wadsworth. This project involves constructing a new prefabricated steel bridge over bear creek just west of Sheridan as well as slight improvements to the trail approaches on each side of the bridge. The scope includes creek widening, as well as a cast in place structural slab on the north side to create a more cost effective second span.

Addendum Two
Prebid Sign in Sheet
Addendum One
Statement of Quantities

Prebid on 9/10/2012 at 11:00 AM
201 W Colfax Ave Conference Room 4.I.2 Denver, CO 80202

Bid Opening on 9/28/2012 at 11:00 AM
1st Floor Conference Room - 1.D.1
201 W. Colfax Ave.
Denver, CO 80202

Plans Available August 27, 2012:
Digital Download
Quest Project #2218258

Plan Cost: $10.00

Project Manager: Ed Haun
Phone: (720) 913-4522
Contract Administrator: Diane Urbina
Phone: (720) 913-1763

SBE Goal: 10.00%

FOR COMPLETE DESCRIPTION SEE AD IN The Daily Journal ON THE FOLLOWING DATES:

Monday, August 27, 2012
Tuesday, August 28, 2012
Wednesday, August 29, 2012

THE FOLLOWING PREQUALIFICATIONS ARE REQUIRED: None


Posted on Aug 28, 2012 (Archive on Oct 01, 2012)
Posted by DMiquel  Contributed by DMiquel
Return    

Feedback