Traffic Signal Upgrade

Traffic Signal Upgrade

Contract No. 201207522
SHE 2011 PKG 2 - TRAFFIC SIGNAL UPGRADE
Project Funding Number PZ03798_417

General Statement of Work
Reconstruct and upgrade 6 existing traffic signals within the City and County of Denver. These traffic signals are located at (1) US 285 EB ramp and Sheridan Blvd; (2) US 285 WB ramp and Sheridan Blvd; (3) Sheridan Blvd and 25th Ave Bryon Pl; (4) Alameda Ave and Clay St; (5) Alameda Ave and Lipan St; and (6) Alameda Ave and South Platte River Drive. The project scope is to remove the existing traffic signal equipment (poles, signal and pedestrian indications, controllers, cabinets, pull boxes and associated equipment) at each of these intersections and replace them with a new traffic signal. All new signals shall be constructed in accordance with the current City and County of Denver Traffic
Engineering Services standards and specifications. General sidewalk/curb ramps/roadway upgrades are also included.

Addendum One
Statement of Quantities

Prebid on 9/6/2012 at 10:00 AM
4th Floor Conference Room 4.J.1
201 W. Colfax Ave.
Denver, CO 80202
Bid Opening on 9/21/2012 at 11:00 AM
1st Floor Conference Room - 1.D.1
201 W. Colfax Ave.
Denver, CO 80202

Plans Available August 29, 2012:

Digital Download
QUESTCDN NO: 2234497,
Plan Cost $10.00
Project Manager: John Yu
Phone: (720) 865-3176
Contract Administrator: JoAnn Phillips
Phone: (720) 913-8524

DBE goal: 15%

FOR COMPLETE DESCRIPTION SEE AD IN The Daily Journal ON THE FOLLOWING DATES:
Wednesday, August 29, 2012
Thursday, August 30, 2012
Friday, August 31, 2012
THE FOLLOWING PREQUALIFICATIONS ARE REQUIRED
3a Traffic Signals
$1,500,000.00

Posted on Aug 29, 2012 (Archive on Sep 22, 2012)
Posted by Manager  Contributed by Manager