High Street Outfall Phase 1

High Street Outfall Phase 1

Public Works - Contract No. 201309598 
HIGH STREET OUTFALL PHASE 1
Project Funding Number: 
  PC70811

General Statement of Work

The High Street Outfall and 40th Avenue System project extends from 40th Street and Blake Street to the South Platte River.  The project is designed to convey 5-year storm water runoff. Phase 1 - Wynkoop Street to Blake Street Phase 1 includes 800 linear feet of 96" diameter CCFRPM pipe to be jacked and bored under the UPRR yard and 160 linear feet of open-cut 8' x 12' reinforced concrete box culvert from the UPRR yard to Wynkoop Street.  Cast-in-place transition structures are to be constructed on each side of the  96" diameter CCFRPM pipe (93" inside diameter).  

Pre-bid Roster

Addendum One


BIDDER QUALIFICATION REQUIREMENT:

Bids will only be accepted from those Contractors who were qualified during Stage 1 of the RFQ/BID process issued on January 10, 2013. 


QUALIFIED CONTRACTORS LIST:
  • BRADSHAW 
  • BTC   
  • CONCRETE WORKS OF COLORADO 
  • LAYNE CIVIL
  • SAK
  • WESTERN SUMMIT

Statement of Quantities 

Pre bid on 2/19/13 at 9:30 AM
4th Floor Conference Room – 4.I.5 
201 W. Colfax Ave.
Denver, CO 80202

Bid Opening on 3/12/13 at 11:00 AM
1st Floor Conference Room – 1.D.1
201 W. Colfax Ave.

Denver, CO 80202

Plans Available February 11, 2013:

Digital Download

Denver, County/City - Projects

Quest Project # 2454174

Plan Cost $10.00

Project Manager: Mark Gehrke
Phone: (303) 446-3619
Contract Administrator: Toni Green
Phone: (720) 913-4508  
 
M/WBE goal: 1.00%


FOR COMPLETE DESCRIPTION SEE AD IN The Daily Journal ON THE FOLLOWING DATES:
Monday, February 11, 2013
Tuesday,     February 12, 2013
Wednesday,   February 13, 2013


   


Posted on Feb 11, 2013 (Archive on Mar 14, 2013)
Posted by Manager  Contributed by Manager
Return    

Feedback