2013 Asphalt/Concrete Surface Replacement

2013 Asphalt/Concrete Surface Replacement

Public Works - Contract No. 201310801
2013 Asphalt/Concrete Surface Replacement
Project Funding Number       

General Statement of Work Repairs and restoration of Asphalt or Concrete surfaces damaged during Wastewater Management in-house construction operations.  The project is a combination of surface replacements for several sewer line repairs and storm improvement projects completed by WMD Construction section.

Statement of Quantities
Pre-bid Roster

Pre-bid on 5/8/13 at 10:30 AM
Wastewater Management
2000 W. 3rd Ave., Denver, CO 80223
3rd Floor Conference Room

Bid Opening on 5/22/13 at 11:00 AM  
1st Floor Conference Room – 1.D.1
201 W. Colfax Ave.
Denver, CO 80202

Plans Available April 25, 2013:
Digital Download
Quest Project # 2639347
Plan Cost          $10.00

Project Manager:                      Ahmad Soufiani
Phone:                                      (303) 446-3717

Contract Administrator:            Toni Green
Phone:                                      (720) 913-4508 

M/WBE goal: 16.00% 

FOR COMPLETE DESCRIPTION SEE AD IN The Daily Journal ON THE FOLLOWING DATES:
Thursday,       April 25, 2013
Friday,            April 26, 2013
Monday,         April 29, 2013

THE FOLLOWING PREQUALIFICATIONS ARE REQUIRED
None


Posted on Apr 25, 2013 (Archive on May 09, 2013)
Posted by Manager  Contributed by Manager
Return    

Feedback