201416852 - 38th and Blake Sidewalks

201416852 - 38th and Blake Sidewalks

Engineering Division - Contract No. 201416852
38TH AND BLAKE TOD SIDEWALKS

Engineer’s Estimate
$1,438,000.00 and $1,758,000.00

General Statement of Work
This project will construct approximately 4200 linear feet of sidewalk/curb and gutter sections near 38th and Blake Street. A new eight-foot wide bike path connection from Blake Street to the 38th Underpass will be built. Sidewalks, street light improvements, drainage improvements, some roadway resurfacing, sidewalk/curb and gutter, striping and some signing, bicycle trail sections and bicycle parking facilities around the proposed 38th and Blake Street light rail station.

Pre-Bid Conference Agenda

Pre-Bid Roster

Prebid on 6/26/2014 at 9:00 AM
Conference Room 3.J.2
201 W. Colfax Ave.
Denver, CO 80202


Bid Opening on 7/11/2014 at 11:00 AM
1st Floor Conference Room - 1.D.1
201 W. Colfax Ave.
Denver, CO 80202

Plans Available June 20, 2014:

Digital Download

QuestCDN Bid Number #3382948
Plan Cost $10.00

Statement of Quantity

Contract Administrator: JoAnn Phillips
Phone: (720) 913-8524

DBE goal: 20%

FOR COMPLETE DESCRIPTION SEE AD IN The Daily Journal ON THE FOLLOWING DATES:
Thursday, June 19, 2014
Friday, June 20, 2014
Monday, June 23, 2014

THE FOLLOWING PREQUALIFICATIONS ARE REQUIRED
1F(3) Sidewalk, Curb and Cutter
$3,000,000.00


Posted on Jun 20, 2014 (Archive on Aug 19, 2014)
Posted by IDougherty  Contributed by IDougherty
Return    

Feedback