201417635 Traffic Signal System Project TSSIP 2013-2014

201417635 Traffic Signal System Project TSSIP 2013-2014

Public Works - Contract No. 201417635

TRAFFIC SIGNAL SYSTEM PROJECT TSSIP 2013-2014

General Statement of Work



Furnish and install system software and equipment, signal equipment (e.g. signal controller cabinets, controllers, Line Conditioning UPSs, Ethernet switches, etc.) interconnect conduit, communication devices, and communication media for signal system projects. In addition, this project will design future signal system improvements. Project encompasses the signalized intersections not already upgraded to Ethernet communications and UPS backup on the following 3 corridors: 1. Colo. Blvd. from Hampden Ave. to 1st Ave. (Denver TSSIP 2013); 2. Colfax Ave. from Sheridan Blvd. to I-25 (Denver TSSIP 2014); 3. Colfax Ave. from Logan St. to Yosemite St. (Denver TSSIP 2014). This project falls under the 2011-2016 CMAQ program.

Estimated Construction Cost



$487,000.00 - $595,000.00

Pre Bid on 8/28/14 at 9:30 AM



1st Floor Conference Room 1.D.1



201 West Colfax Ave.



Denver, CO 80202

Bid Opening on 9/18/14 at 11:00 AM

1st Floor Conference Room 1.D.1



201 West Colfax Ave.



Denver, CO 80202

Plans Available August 18, 2014:



Digital Download

Quest Project # 3487119

Plan Cost $10.00

Statement of Quantities

Pre-Bid Conference Roster

Addenda 1

 

Contract Administrator: Toni Green



Toni.green@denvergov.org

DBE goal: 8.00%

FOR COMPLETE DESCRIPTION SEE AD IN The Daily Journal ON THE FOLLOWING DATES:



Monday, August 18, 2014



Tuesday, August 19, 2014



Wednesday, August 20, 2014

THE FOLLOWING PREQUALIFICATIONS ARE REQUIRED

None


Posted on Aug 15, 2014 (Archive on Oct 14, 2014)
Posted by IDougherty  Contributed by IDougherty
Return    

Feedback