Skip navigation

2013 Archive

Results 1 - 10 of 37

Dec 12, 2013

Professional Services for National Western Center Development Master Plan

The City and County of Denver (City), in partnership with the National Western Stock Show (NWSS), Colorado State University, Denver Museum of Nature and Science and History Colorado, hereinafter referred to as the “NWC Partners” seek a team to provide professional planning and technical services to lead the National Western Center Master Plan effort in 2014.

Nov 12, 2013

2013 PAVEMENT MARKINGS FOR CONCRETE ROADWAYS

Replacement of existing pavement markings on City streets that are made of concrete.

Nov 6, 2013

2013 General Storm

2013 Citywide General Storm Improvements.  This project will include the S. Holly  & Pacific  Place Outfall project and S. Poplar  Storm Outfall.

Nov 6, 2013

2014 Critical Sewer Lining

A (3) yearlong contract for emergency rehabilitation of Sewer facilities with structural deterioration problems, using Wastewater Management Division’s approved cured-in-place liner method of construction.  All work will be initiated through written work requests issued by the City Project Manager. Work may also include manhole lining as detailed in section 15 of the Storm Drainage and Sanitary Sewer Construction Detail and Technical Specifications. 

Nov 1, 2013

Professional Services for McNichols Building Renovation Ph. 2

The City and County of Denver is seeking a professional design services for the McNichols Renovation Phase 2.  This design includes the reconstruction of the Historic Grand Staircase, installation of a freight elevator, and relocation of  the Restrooms on the 3rd Floor of the McNichols Building located at 144 West Colfax, Denver, CO.

Oct 2, 2013

2013 Citywide Concrete Repairs Phase 4

Citywide concrete repair to curb and gutter, concrete streets, alleys and crosspans including ADA curb ramps and 311 citizen complaints.

Sep 26, 2013

University & Josephine Street Reconstruction & Cherry Creek North Outfall

This project involves several main components of work: roadway reconstruction, traffic signal replacement and a storm sewer outfall. The road reconstruction is concrete paving on University Blvd. from 6th Ave. to Cherry Creek North Drive and Josephine St. from 1st Ave. to 2nd Ave., and new traffic signals at all intersections on University Blvd. and Josephine St. from 1st Ave. to 6th Ave.

Sep 18, 2013

Colorado Center Bicycle/Pedestrian Bridge Over I-25

The Work generally consists of the design, fabrication, painting and erection of a simple span, steel combined arch and truss pedestrian bridge with a reinforced concrete deck spanning over Interstate 25, and associated approach ramps.  The main span over I-25 is over 300 feet in length.  The approach ramps will be prestressed concrete box girders.  The Work also includes utility work and coordination, storm sewer installation, roadway work, signage and stripping, lighting, coordination with the public and the project neighbors, and all traffic control necessary to construct the project.

Sep 16, 2013

End of Road Sign Replacement

The contractor shall install End of Road Barricades with either contractor supplied or city supplied Type III 10 foot long Hollow Plastic panels, and end of road markers with complete posts, supports, fittings and concrete bases, where requiredin accordance with the City and County of Denver Traffic Standard Drawings as well as the state of Colorado Standard specification for road and Bridge Construction 2011 edition (Green Book).

Sep 4, 2013

Red Rocks Bridge and Roadway Project

Replace existing Bridge at Red Rocks Park entrance #2 and improve the intersection of Red Rocks Park Road and CR 93.