Dec 28, 2016

Contract 201632041 2017 Citywide ADA Ramp and Concrete Repair, Phase 3

Citywide construction of ADA Ramps including concrete repairs to curb, gutter, sidewalk, valley gutter, concrete street and alley. Potential work locations coincide with the 2016-2017 Street Maintenance Paving Program that may be referenced in the Appendices at the end of this Contract. The City may award more than one contract.

Dec 14, 2016

Contract 201631974 Ramp 1-42 Morrison Alameda Knox

*Note new meeting and bid opening dates*
Traffic Signal Upgrade with bicycle traffic signals; and curb line, striping, and signage changes to create an above-curb bike trail on Knox Ct. from Alameda Ave. to Nevada Place.

Dec 12, 2016

Contract 201632002 Hadley Library Renovation

*Note new bid opening date*
The purpose of the project is to renovate the 1st floor of the Library and make the basement accessible for future program use. The renovation scope includes the following key components: 1) An IdeaLAB space which will function as a makerspace and digital media lab. 2) A two stop elevator that serves the basement and First Floor. 3) An egress stair from the basement to the 1st Floor in addition to the existing stair. 4) Reconfiguration of the Staff space. 5) Reconfiguration of all the shelving as well as children's area, computer lab space as well as front desk. 6) Basement improvements for Life Safety and as future flexible space.

Dec 05, 2016

Contract No. 201631709 Mt Harvard General Storm

The purpose of this project is to install new storm drain systems to mitigate localized ponding/flooding issues. Water utility relocations, surface restoration, concrete flatwork, landscaping and asphalt paving will also be part of the project scope. The two locations included in this project are at 10th and Grove and 3rd and Mariposa.

Dec 02, 2016

Contract 201631819 33rd Street Outfall (31st and 36th Street Outfall Project) Segment – Blake St. To Arapahoe St.

*Bid opening postponed to Tuesday, February 14, 2017 at 11am*
This project is to improve the drainage conditions in the Basins 0062-01 & 4500-02 (bounded by S. Platte River to East 13th Ave. and from North Williams Street to North Grant Street) during a 5 year storm event. This phase of the project is to construct the storm sewer system and its associated facilities along 33rd Street corridor starting at the Blake Street and ending at Arapahoe Street. Also included is the Add Alt. 1 between Arapahoe and Curtis Streets on the same corridor.

Dec 01, 2016

Contract 201631820 2017 Citywide ADA Ramp & Concrete Repair, Phase 2

NOTE: Due to the weather we are cancelling the January 5 bid opening and rescheduling for Thursday, January 12 at 11:00 a.m. Please look for an addendum to be posted. This will also be re-advertised in the Daily Journal and updated on Work4Denver.com.
Citywide construction of ADA Ramps including concrete repairs to curb, gutter, sidewalk, valley gutter, concrete street and alley. Potential work locations coincide with the 2016-2017 Street Maintenance Paving Program that may be referenced in the Appendices at the end of this Contract. The City may award more than one contract to more than one General Contractor.

Nov 30, 2016

Contract 201631725 2017 Downtown ADA Ramp & Concrete Repair Phase 1

Citywide construction of ADA Ramps including concrete repairs to curb, gutter, sidewalk, valley gutter, concrete street and alley. Potential work locations coincide with the 2016-2017 Street Maintenance Paving Program that may be referenced in the Appendices at the end of this Contract. The City may award more than one contract to more than one General Contractor.

Nov 28, 2016

Contract No. 201631711 Mt Elbert General Storm

The purpose of this project is to install new storm drain systems to mitigate localized ponding/flooding issues. Water utility relocations, surface restoration, concrete flatwork, landscaping and asphalt paving will also be a part of project scope. The three locations included in this project are at W 11th Ave & Wolff St, W 41st Ave & Osceola St, and Mexico Ave & S Oneida St.

Nov 15, 2016

Contract 201631445 2016 Pavement Marking Master On-Call

The 2016 Pavement Marking Master On-Call will be to install new and/or maintain existing pavement markings within the City and County of Denver. Types of pavement markings include crosswalks, words/symbols, decorative markings, long/dash lane lines, etc. Materials used will consist of thermoplastic pavement marking, preformed thermoplastic pavement marking, epoxy and modified epoxy and waterbourne paint pavement markings, and preformed thermoplastic pavement marking adhesive for asphalt and concrete roadway surfaces. This contract is a Three Year Contract. We are looking to award multiple contracts.

Oct 20, 2016

RFQ: Design-Build Services for City Park Golf Course

The Department of Public Works, City and County of Denver has issued a Request for Qualifications (RFQ) for Design-Build services for the Platte to Park Hill: Stormwater Systems – City Park Golf Course Parks and Drainage Improvements Design-Build (Project). The Project will renovate the City Park Golf Course to provide a high quality 18-hole regulation municipal golf course designed and constructed to United States Golf Association (USGA) recommendations/guidelines, modified to City standards, that has a more efficient layout while integrating detention that provides flood protection to the community, improves water quality, and provides enhanced public space and facilities. The work included for this procurement includes the design and construction of the City Park Golf Course, integrated detention, short game/chipping area, driving range, First Tee facilities, putting greens, irrigation, parking lots, retaining walls, accessory/outbuilding structures, as well as potential demolition and reconstruction of the clubhouse.