The City of Denver recently implemented a security enhancement to better protect our online payment processing system.  As a result of this enhancement, we are no longer able to accept payments from non-current browsers. If you are using an older browser version, please upgrade your browser to the most current version so that you can access the online payment service.

Contract 201839505 2018 Citywide ADA Ramp and Concrete Repair Phase 1

General Statement of Work: Citywide construction of ADA Ramps including concrete repairs to curb, gutter, sidewalk, valley gutter, concrete street and alley. Potential work locations coincide with the 2018 - 2019 Street Maintenance Paving Program that may be referenced in the Appendices at the end of this contract. Contractor interested in bidding must be in the 1F(2) or 1F(3) category and pre-qualified to the $3,000,000 level. The City may award more than one contract to more than one General Contractor.   

Estimated Construction Cost
Between $2,532,510.00 and $3,095,290.00

Statement of Quantities (PDF)

Pre-bid on 1/30/2018 at 9:00 AM

Webb Building
201 W Colfax Avenue
4th floor conference room 4.I.4
Denver, CO 80202

Sign-in Sheet (PDF)

Questions Deadline: February 6, 2018 at 2:00 p.m. local time

Addendum #1 (PDF)

Bid Opening on 2/15/2018 at 11:00 AM

Webb Building,
201 W. Colfax Avenue
6th floor conference room 6.G.7
Denver, CO 80202

Plans Available January 17, 2018

Digital Download

QuestCDN Project #5485624
Plan Cost   $10.00

M/WBE goal:  12%

Prequalification:
1F(2) Concrete or 1(F)3 Sidewalk Curb & Gutter in the $3,000,000.00 level

Contract Administrator: Diane Mora
diane.mora@denvergov.org

FOR COMPLETE DESCRIPTION SEE AD IN The Daily Journal ON THE FOLLOWING DATES