2016 construction schedules

See the history of ramp construction, asphalt and landscape repairs by neighborhood that were scheduled and announced in the current year. All work is weather dependent and subject to change.


Week of December 12 - 16 (weather permitting):

  • Hilltop: Colorado Blvd to Holly Street between Alameda and 6th Avenues, (Chatos Concrete), Inspector: Bill Friend

November 7 – December 9 (weather permitting):

  • West Colfax/Sloan Lake: Sheridan to Federal and 38th to Colfax Avenues, (Silva Construction), Inspector: Blake Russo-Nixon

Week of October 31 - November 4 (weather permitting):

  • West Colfax: Lowell to Federal Boulevards between 20th and Colfax Avenues, (Silva Construction), Inspector: Blake Russo-Nixon

Week of October 24 - 28 (weather permitting):

  • Highland/Sloan Lake: Sheridan to Federal Boulevards between 10th and 38th Avenues, (Silva Construction), Inspector: Blake Russo-Nixon
  • Hilltop/Crestmoor: Colorado Boulevard to Monaco Parkway between 1st and Alameda Avenues, (Chato's Concrete), Inspector: Bill Friend
  • Rosedale/University: Iliff to Yale Avenues between Huron Street and Broadway, and Dartmouth Avenue & Garfield Street, (Keene Concrete), Inspector: Lawrence Alcaraz
  • Holly Street & Alameda Avenue

Week of October 17 - 21 (weather permitting):

  • Wellshire/University: Iliff to Dartmouth Avenues between University Boulevard and Broadway, (Keene Concrete), Inspector: Lawrence Alcaraz
  • Highlands: Federal Boulevard to Huron Street between 20th and 38th Avenues, (Silva Construction), Inspector: Blake Russo-Nixon
  • Bear Valley: Wadsworth to Sheridan Boulevards between Yale and Dartmouth Avenues, (Fasick Concrete), Inspector: Gary Padilla
  • Hilltop/Crestmoor: Colorado Boulevard to Monaco Parkway between 6th and Alameda Avenues, (Chato's Concrete), Inspector: Bill Friend
  • Hale: North side of 8th Avenue between Colorado Boulevard and Holly Street, (Chato's Concrete), Inspector: Bill Friend

Week of October 10 - 14 (weather permitting):

  • Wellshire/University: Iliff to Dartmouth Avenues between University Boulevard and Broadway, (Keene Concrete), Inspector: Lawrence Alcaraz
  • Highlands: Federal Boulevard to Huron Street between 20th and 38th Avenues, (Silva Construction), Inspector: Blake Russo-Nixon
  • Bear Valley: Wadsworth to Sheridan Boulevards between Yale and Dartmouth Avenues, (Fasick Concrete), Inspector: Gary Padilla
  • Hilltop/Crestmoor: Colorado Boulevard to Monaco Parkway between 6th and Alameda Avenues, (Chato's Concrete), Inspector: Bill Friend
  • Hale: North side of 8th Avenue between Colorado Boulevard and Holly Street, (Chato's Concrete), Inspector: Bill Friend

Week of October 3 - 7 (weather permitting):

  • Wellshire/University: Yale to Dartmouth Avenues between Colorado Boulevard and Franklin Street; Dartmouth to Hampden Avenues between University Boulevard and Steele Street, (Keene Concrete), Inspector: Lawrence Alcaraz
  • Bear Valley: Wadsworth to Sheridan Boulevards between Yale and Dartmouth Avenues, (Fasick Concrete), Inspector: Gary Padilla
  • Hilltop/Crestmoor: Colorado Boulevard to Monaco Parkway between 6th and Alameda Avenues, (Chato's Concrete), Inspector: Bill Friend
  • Hale: North side of 8th Avenue between Colorado Boulevard and Holly Street, (Chato's Concrete), Inspector: Bill Friend

Week of September 26 - 30 (weather permitting):

  • Wellshire/University: Yale to Dartmouth Avenues between Colorado Boulevard and Franklin Street; Dartmouth to Hampden Avenues between University Boulevard and Steele Street, (Keene Concrete), Inspector: Lawrence Alcaraz
  • Bear Valley: Wadsworth to Sheridan Boulevards between Yale and Dartmouth Avenues, (Fasick Concrete), Inspector: Gary Padilla
  • Hilltop/Crestmoor: Colorado Boulevard to Monaco Parkway between 6th and Alameda Avenues, (Chato's Concrete), Inspector: Bill Friend
  • Hale: North side of 8th Avenue between Colorado Boulevard and Holly Street, (Chato's Concrete), Inspector: Bill Friend

Week of September 19 - 23 (weather permitting):

  • University Park: Jewell to Yale Avenues between Colorado Boulevard and Steele Street, (Keene Concrete), Inspector: Lawrence Alcaraz
  • Bear Valley: Wadsworth to Sheridan Boulevards between Yale and Dartmouth Avenues, (Fasick Concrete), Inspector: Gary Padilla
  • Hilltop/Crestmoor: Colorado Boulevard to Monaco Parkway between 6th and Alameda Avenues, (Chato's Concrete), Inspector: Bill Friend

Week of September 12 - 16 (weather permitting):

  • Elyria/Swansea: 48th to 38th Avenues between York Street and Colorado Boulevard, (Silva Construction), Inspector: Blake Russo-Nixon
  • Belcaro: Clean-up and landscape repairs only from Exposition to Mississippi Avenues between Colorado Boulevard and Steele Street, (Keene Concrete), Inspectors: Aaron McMichael & Brian Hoover
  • University Park: Jewell to Yale Avenues between Colorado Boulevard and Steele Street, (Keene Concrete), Inspector: Lawrence Alcaraz
  • Bear Valley: Wadsworth to Sheridan Boulevards between Yale and Dartmouth Avenues, (Fasick Concrete), Inspector: Gary Padilla
  • Hale/Montclair: Colorado Boulevard to Monaco Parkway between Colfax and 6th Avenues, (Chato's Concrete), Inspector: Bill Friend

Week of September 6 - 9 (weather permitting):

  • Elyria/Swansea: 48th to 38th Avenues between York Street and Colorado Boulevard, (Silva Construction), Inspector: Blake Russo-Nixon
  • Belcaro: Exposition to Mississippi Avenues between Colorado Boulevard and Steele Street, (Keene Concrete), Inspectors: Aaron McMichael & Brian Hoover
  • Bear Valley: Wadsworth to Sheridan Boulevards between Yale and Dartmouth Avenues, (Fasick Concrete), Inspector: Gary Padilla
  • Hale/Montclair: Colorado Boulevard to Monaco Parkway between Colfax and 6th Avenues, (Chato's Concrete), Inspector: Bill Friend

Week of August 29 - September 2 (weather permitting):

  • Elyria/Swansea: 52nd to 40th Avenues between York Street and Colorado Boulevard, (Silva Construction), Inspector: Blake Russo-Nixon
  • Bonnie Brae: Exposition to Mississippi Avenues between Steele Street and University Boulevard, (Keene Concrete), Inspectors: Aaron McMichael & Brian Hoover
  • Belcaro: Exposition to Mississippi Avenues between Colorado Boulevard and Steele Street, (Keene Concrete), Inspectors: Aaron McMichael & Brian Hoover
  • Bear Valley: Wadsworth to Sheridan Boulevards between Yale and Dartmouth Avenues, (Fasick Concrete), Inspector: Gary Padilla
  • Hale/Montclair: Colorado Boulevard to Monaco Parkway between Colfax and 6th Avenues, (Chato's Concrete), Inspector: Bill Friend

Week of August 22 - 26 (weather permitting):

  • Elyria/Swansea: 52nd to 40th Avenues between York Street and Colorado Boulevard, (Silva Construction), Inspector: Blake Russo-Nixon
  • Bonnie Brae: Exposition to Mississippi Avenues between Steele Street and University Boulevard, (Keene Concrete), Inspectors: Aaron McMichael & Brian Hoover
  • Belcaro: Exposition to Mississippi Avenues between Colorado Boulevard and Steele Street, (Keene Concrete), Inspectors: Aaron McMichael & Brian Hoover
  • Bear Valley: Wadsworth to Sheridan Boulevards between Yale and Dartmouth Avenues, (Fasick Concrete), Inspector: Rand Peterson
  • Hale/Montclair: Colorado Boulevard to Monaco Parkway between Colfax and 6th Avenues, (Chato's Concrete), Inspector: Bill Friend

Week of August 15-19 (weather permitting):

  • Green Valley Ranch: 56th to 40th Avenues between Telluride Street and Piccadilly Road, (Silva Construction), Inspector: Blake Russo-Nixon
  • Bonnie Brae: Exposition to Mississippi Avenues between Steele Street and University Boulevard, (Keene Concrete), Inspectors: Aaron McMichael & Brian Hoover
  • Belcaro: Exposition to Mississippi Avenues between Colorado Boulevard and Steele Street, (Keene Concrete), Inspectors: Aaron McMichael & Brian Hoover
  • Bear Valley: Wadsworth to Sheridan Boulevards between Yale and Dartmouth Avenues, (Fasick Concrete), Inspector: Rand Peterson
  • South Park Hill: Monaco Street to Colorado Boulevard between Montview Boulevard and Colfax Avenue, (Chato's Concrete), Inspector: Bill Friend
  • Hale/Montclair: Colorado Boulevard to Monaco Parkway between Colfax and 6th Avenues, (Chato's Concrete), Inspector: Bill Friend

Week of August 8-12 (weather permitting):

  • Montbello/Green Valley Ranch: 56th to I-70 between Dayton and Potomac Streets, (Silva Construction), Inspector: Blake Russo-Nixon
  • Green Valley Ranch: 56th to 40th Avenues between Telluride Street and Piccadilly Road, (Silva Construction), Inspector: Blake Russo-Nixon
  • Bonnie Brae: Exposition to Mississippi Avenues between Steele Street and University Boulevard, (Keene Concrete), Inspector: Brian Hoover
  • Bear Valley: Wadsworth to Sheridan Boulevards between Yale and Dartmouth Avenues, (Fasick Concrete), Inspector: Rand Peterson
  • South Park Hill: Monaco Street to Colorado Boulevard between Montview Boulevard and Colfax Avenue, (Chato's Concrete), Inspector: Bill Friend

Week of August 1 - 5 (weather permitting):

  • Montbello/Green Valley Ranch: 56th to I-70 between Dayton and Potomac Streets, (Silva Construction), Inspector: Blake Russo-Nixon
  • Bonnie Brae: Exposition to Mississippi Avenues between Steele Street and University Boulevard, (Keene Concrete), Inspector: Brian Hoover
  • Bear Valley: Wadsworth to Sheridan Boulevards between Yale and Dartmouth Avenues, (Fasick Concrete), Inspector: Gary Padilla
  • South Park Hill: Monaco Street to Colorado Boulevard between Montview Boulevard and Colfax Avenue, (Chato's Concrete), Inspector: Bill Friend

 

Week of July 25 - 29 (weather permitting)

  • Montbello/Green Valley Ranch: 56th to I-70 between Dayton and Potomac Streets, (Silva Construction), Inspector: Blake Russo-Nixon
  • Bonnie Brae: Exposition to Mississippi Avenues between Steele Street and University Boulevard, (Keene Concrete), Inspector: Aaron McMichael and Brian Hoover
  • Marston/Grant Ranch: Kipling Avenue to Wadsworth Boulevard between Quincy and Belleview Avenues, (Fasick Concrete), Inspector: Gary Padilla
  • Bear Valley: Wadsworth to Sheridan Boulevards between Yale and Dartmouth Avenues, (Fasick Concrete), Inspector: Gary Padilla
  • South Park Hill: Monaco Street to Colorado Boulevard between Montview Boulevard and Colfax Avenue, (Chato's Concrete), Inspector: Bill Friend

Week of July 18 - 22 (weather permitting):

  • Montbello/Green Valley Ranch: 56th to I-70 between Potomac Street and Chambers Road, (Silva Construction), Inspector: Ken Magee
  • Cory-Merrill: Florida to Jewell Avenues between Colorado and University Boulevards, (Keene Concrete), Inspector: Aaron McMichael
  • Bonnie Brae: Exposition to Mississippi Avenues between Steele Street and University Boulevard, (Keene Concrete), Inspector: Aaron McMichael
  • Marston/Grant Ranch: Kipling Avenue to Wadsworth Boulevard between Quincy and Belleview Avenues, (Fasick Concrete), Inspector: Gary Padilla
  • Bear Valley: Wadsworth to Sheridan Boulevards between Yale and Dartmouth Avenues, (Fasick Concrete), Inspector: Gary Padilla
  • South Park Hill: Monaco Street to Colorado Boulevard between Montview Boulevard and Colfax Avenue, (Chato's Concrete), Inspector: Bill Friend
  • Montview Boulevard, north side: Albion to Kearney Streets, (Chato's Concrete), Inspector: Bill Friend
  • Hale: Colorado Boulevard to Dahlia Street between 10th and Colfax Avenues, (Chato's Concrete), Inspector: Bill Friend

Week of July 11 - 15 (weather permitting):

  • Montbello/Green Valley Ranch: 56th to I-70 between Potomac Street and Chambers Road, (Silva Construction), Inspector: Ken Magee
  • Goldsmith Gulch: Florida to Jewell Avenues between Colorado Boulevard and Holly Street, (Keene Concrete), Inspector: Aaron McMichael
  • Marston/Grant Ranch: Kipling Avenue to Wadsworth Boulevard between Quincy and Belleview Avenues, (Fasick Concrete), Inspector: Gary Padilla
  • South Park Hill: Monaco Street to Colorado Boulevard between Montview Boulevard and Colfax Avenue, (Chato's Concrete), Inspector: Bill Friend
  • Montview Boulevard, south side: Grape to Locust Streets, (Chato's Concrete), Inspector: Bill Friend

Week of July 5 - 8  (weather permitting):

  • Montbello/Green Valley Ranch: 56th to I-70 between Potomac Street and Chambers Road, (Silva Construction), Inspector: Ken Magee
  • Goldsmith Gulch: Florida to Jewell Avenues between Colorado Boulevard and Holly Street, (Keene Concrete), Inspector: Aaron McMichael
  • Marston/Grant Ranch: Kipling Avenue to Wadsworth Boulevard between Quincy and Belleview Avenues, (Fasick Concrete), Inspector: Gary Padilla
  • South Park Hill: Monaco Street to Colorado Boulevard between Montview Boulevard and Colfax Avenue, (Chato's Concrete), Inspector: Bill Friend
  • Montview Boulevard, south side: Cherry to Grape Streets, (Chato's Concrete), Inspector: Bill Friend

Week of June 27 - July 1  (weather permitting):

  • Montbello/Green Valley Ranch: 56th to I-70 between Potomac Street and Chambers Road, (Silva Construction), Inspector: Ken Magee
  • Goldsmith Gulch: Florida to Jewell Avenues between Colorado Boulevard and Holly Street, (Keene Concrete), Inspector: Aaron McMichael
  • Marston/Grant Ranch: Kipling Avenue to Wadsworth Boulevard between Quincy and Belleview Avenues, (Fasick Concrete), Inspector: Gary Padilla
  • South Park Hill: Monaco Street to Colorado Boulevard between Montview Boulevard and Colfax Avenue, (Chato's Concrete), Inspector: Bill Friend
  • Montview Boulevard, south side: Albion to Forest Streets, (Chato's Concrete), Inspector: Bill Friend

Week of June 20 -24  (weather permitting):

  • Montbello/Green Valley Ranch: 56th to I-70 between Potomac Street and Chambers Road, (Silva Construction), Inspector: Ken Magee
  • Goldsmith Gulch: Florida to Jewell Avenues between Colorado Boulevard and Holly Street, (Keene Concrete), Inspector: Aaron McMichael
  • Marston/Grant Ranch: Kipling Avenue to Wadsworth Boulevard between Quincy and Belleview Avenues, (Fasick Concrete), Inspector: Gary Padilla
  • NE Park Hill: Monaco to Dahlia Streets between MLK Boulevard and 26th Avenue, (Chato's Concrete), Inspector: Bill Friend
  • South Park Hill: Monaco Street to Colorado Boulevard between Montview Boulevard and Colfax Avenue, (Chato's Concrete), Inspector: Bill Friend

Week of June 13 - 17  (weather permitting):

  • Montbello/Green Valley Ranch: 56th to I-70 between Potomac Street and Chambers Road, (Silva Construction), Inspector: Ken Magee
  • Goldsmith Gulch: Florida to Jewell Avenues between Colorado Boulevard and Monaco Parkway, (Keene Concrete), Inspector: Aaron McMichael
  • Marston/Grant Ranch: Kipling Avenue to Wadsworth Boulevard between Quincy and Belleview Avenues, (Fasick Concrete), Inspector: Gary Padilla
  • NE Park Hill: Monaco to Dahlia Streets between MLK Boulevard and 26th Avenue, (Chato's Concrete), Inspector: Bill Friend
  • South Park Hill: Monaco Street to Colorado Boulevard between Montview Boulevard and Colfax Avenue, (Chato's Concrete), Inspector: Bill Friend

Week of June 6 - 10  (weather permitting):

  • Sunnyside: W. 46th to W. 44th Avenues between Zuni and Pecos Streets, (Keene Concrete), Inspector: Lawrence Alcaraz
  • Globeville: W. 38th to W. 46th Avenues between N. Pecos to N. Cherokee Streets, (Keene Concrete), Inspector: Lawrence Alcaraz
  • Montbello/Green Valley Ranch: 56th to I-70 between Potomac Street and Chambers Road, (Silva Construction), Inspector: Ken Magee
  • Goldsmith Gulch: Florida to Jewell Avenues between Colorado Boulevard and Monaco Parkway, (Keene Concrete), Inspector: Aaron McMichael
  • Marston Lake/Marston Slopes: Kipling Avenue to Wadsworth Boulevard between Quincy and Belleview Avenues, (Fasick Concrete), Inspector: Gary Padilla
  • NE Park Hill: Monaco to Dahlia Streets between MLK Boulevard and 26th Avenue, (Chato's Concrete), Inspector: Bill Friend

Week of May 31 - June 3  (weather permitting):

  • Sunnyside: W. 46th to W. 44th Avenues between Zuni and Pecos Streets, (Keene Concrete), Inspector: Lawrence Alcaraz
  • Montbello/Green Valley Ranch: 56th to I-70 between Potomac Street and Chambers Road, (Silva Construction), Inspector: Ken Magee
  • Goldsmith Gulch: Florida to Jewell Avenues between Colorado Boulevard and Monaco Parkway, (Keene Concrete), Inspector: Aaron McMichael
  • Marston Lake/Marston Slopes: Kipling Avenue to Wadsworth Boulevard between Quincy and Belleview Avenues, (Fasick Concrete), Inspector: Gary Padilla
  • NE Park Hill: Monaco to Dahlia Streets between MLK Boulevard and 26th Avenue, (Chato's Concrete), Inspector: Bill Friend
  • South Park Hill: Monaco Street to Colorado Boulevard between Montview Boulevard and Colfax Avenue, (Chato's Concrete), Inspector: Gary Stanhope

Week of May 23 - 27 (weather permitting):

  • Sunnyside: W. 46th to W. 44th Avenues between Zuni and Pecos Streets, (Keene Concrete), Inspector: Lawrence Alcaraz
  • Montbello/Green Valley Ranch: 56th to I-70 between Potomac Street and Chambers Road, (Silva Construction), Inspector: Ken Magee
  • Goldsmith Gulch: Florida to Jewell Avenues between Colorado Boulevard and Monaco Parkway, (Keene Concrete), Inspector: Aaron McMichael
  • Marston Lake/Marston Slopes: Kipling Avenue to Wadsworth Boulevard between Quincy and Belleview Avenues, (Fasick Concrete), Inspector: Gary Padilla
  • NE Park Hill: Monaco to Dahlia Streets between MLK Boulevard and 26th Avenue, (Chato's Concrete), Inspector: Bill Friend
  • South Park Hill: Monaco Street to Colorado Boulevard between Montview Boulevard and Colfax Avenue, (Chato's Concrete), Inspector: Gary Stanhope

Week of May 16 - 20 (weather permitting):

  • Sunnyside: W. 46th to W. 44th Avenues between Zuni and Pecos Streets, (Keene Concrete), Inspector: Lawrence Alcaraz
  • Montbello/Green Valley Ranch: 56th to I-70 between Potomac Street and Chambers Road, (Silva Construction), Inspector: Ken Magee
  • Goldsmith Gulch: Yale to Jewell Avenues between Quebec and Holly Streets, (Keene Concrete), Inspector: Aaron McMichael
  • Marston Lake/Marston Slopes: Kipling Avenue to Wadsworth Boulevard between Quincy and Belleview Avenues, (Fasick Concrete), Inspector: Gary Padilla

Week of May 9 - 13 (weather permitting):

  • Sunnyside: Federal Blvd. to Zuni St. between 38th Ave. and I-70, (Keene Concrete), Inspector: Lawrence Alcaraz
  • Montbello/Green Valley Ranch: 56th to I-70 between Potomac Street and Chambers Road, (Silva Construction), Inspector: Gary Padilla
  • Goldsmith Gulch: Yale to Jewell Avenues between Quebec and Holly Streets, (Keene Concrete), Inspector: Aaron McMichael

Week of May 2 - 6 (weather permitting):

  • Sunnyside/Berkeley: I-70 to 44th Avenue and Tennsyon to Zuni Streets, (Keene Concrete), Inspector: Lawrence Alcaraz
  • Montbello/Green Valley Ranch: 56th to I-70 between Peoria Street and Chambers Road, (Silva Construction), Inspector: Gary Padilla
  • Goldsmith Gulch: Yale to Iliff Avenues between Quebec and Holly Streets, (Keene Concrete), Inspector: Aaron McMichael

Week of April 25 - 29 (weather permitting):

  • Sunnyside/Berkeley: I-70 to 44th Avenue and Tennsyon to Zuni Streets, (Keene Concrete), Inspector: Lawrence Alcaraz
  • Montbello/Green Valley Ranch: 56th to I-70 between Peoria Street and Chambers Road, (Silva Construction), Inspector: Gary Padilla
  • Goldsmith Gulch: Yale to Iliff Avenues between Quebec and Holly Streets, (Keene Concrete), Inspector: Aaron McMichael

Week of April 18 - 22 (weather permitting):

  • Sunnyside/Berkeley: I-70 to 44th Avenue and Tennsyon to Zuni Streets, (Keene Concrete), Inspector: Lawrence Alcaraz
  • University Hills: Yale to Dartmouth Avenues between Dahlia and Holly Streets, (Keene Concrete), Inspector: Aaron McMichael
  • Montbello: 56th to I-70 between Peoria Street and Chambers Road, (Silva Construction), Inspector: Gary Padilla
  • Goldsmith Gulch: Yale to Iliff Avenues between Quebec and Holly Streets, (Keene Concrete), Inspector: Aaron McMichael

Week of April 11 - 15 (weather permitting):

  • Sunnyside/Berkeley: I-70 to 44th Avenue and Tennsyon to Zuni Streets, (Keene Concrete), Inspector: Lawrence Alcaraz
  • University Hills: Yale to Dartmouth Avenues between Dahlia and Holly Streets, (Keene Concrete), Inspector: Aaron McMichael
  • Montbello: 56th to I-70 between Peoria Street and Chambers Road, (Silva Construction), Inspector: Gary Padilla
  • Goldsmith Gulch: Yale to Iliff Avenues between Quebec and Holly Streets, (Keene Concrete), Inspector: Aaron McMichael

Week of April 4 - 8 (weather permitting):

  • Sunnyside/Berkeley: I-70 to 44th Avenue and Tennsyon to Zuni Streets, (Keene Concrete), Inspector: Lawrence Alcaraz
  • University Hills: Hampden to Yale Avenues between Colorado Boulevard and Holly Street, (Keene Concrete), Inspector: Aaron McMichael
  • Montbello: 56th to I-70 between Peoria Street and Chambers Road, (Silva Construction), Inspector: Gary Padilla

Week of March 29 - April 1 (weather permitting)

  • Inspiration Point: 52nd Avenue from Tennyson Street to Lowell Boulevard, (Keene Concrete), Inspector: Lawrence Alcaraz
  • Sunnyside/Berkeley: I-70 to 44th Avenue and Tennsyon to Zuni Streets, (Keene Concrete), Inspector: Lawrence Alcaraz
  • Park Hill: MLK Jr. Boulevard to 26th Avenue between Dahlia and Quebec Streets, (Chato's Concrete), Inspector: Bill Friend
  • University Hills: Completing concrete repairs and clean-up from Hampden to Mansfield Avenues between Dahlia to Monaco Parkway; Starting ramp installations from Hampden to Yale Avenues between Colorado Boulevard and Holly Street, (Keene Concrete), Inspector: Aaron McMichael
  • Montbello: 56th to I-70 between Peoria and Chambers, (Silva Construction), Inspector: Gary Padilla

Week of March 21 - 25 (weather permitting)

  • Inspiration Point: Harlan Street to Lowell Boulevard between 50th and 52nd Avenues, (Keene Concrete), Inspector: Lawrence Alcaraz
  • Park Hill: 25th Avenue to Montview Boulevard between Colorado Boulevard and Dahlia Street, (Chato's Concrete), Inspector: Bill Friend
  • Park Hill: MLK Jr. Boulevard to 26th Avenue between Dahlia and Quebec Streets, (Chato's Concrete), Inspector: Bill Friend
  • Southmoor Park: Hampden to Mansfield Avenues between Dahlia to Monaco Parkway, (Keene Concrete), Inspector: Aaron McMichael
  • University Hills: Hampden to Yale Avenues between Colorado Blvd. and Holly Street, (Keene Concrete), Inspector: Aaron McMichael
  • Westwood and Mar Lee: Alameda Avenue to Florida Avenue between Sheridan and Federal Boulevards, (Silva Construction), Inspector: Gary Padilla

Week of March 14 - 18 (weather permitting)

  • Inspiration Point: Harlan Street to Lowell Boulevard between 50th and 52nd Avenues, (Keene Concrete), Inspector: Lawrence Alcaraz
  • Park Hill: 25th Avenue to Montview Boulevard between Colorado Boulevard and Dahlia Street, (Chato's Concrete), Inspector: Bill Friend
  • Park Hill: MLK Jr. Boulevard to 26th Avenue between Dahlia and Quebec Streets, (Chato's Concrete), Inspector: Bill Friend
  • Southmoor Park: Hampden to Mansfield Avenues between Dahlia to Monaco Parkway, (Keene Concrete), Inspector: Aaron McMichael
  • University Hills: Hampden to Yale Avenues between Colorado Blvd. and Holly Street, (Keene Concrete), Inspector: Aaron McMichael
  • Westwood and Mar Lee: Alameda Avenue to Florida Avenue between Sheridan and Federal Boulevards, (Silva Construction), Inspector: Gary Padilla

Week of March 7 - 11 (weather permitting)

  • Lincoln Park/Baker: Alameda to Colfax Avenues between I-25 and Speer Boulevard, (Keene Concrete), Inspector: Bill Friend
  • Inspiration Point: Harlan Street to Sheridan Boulevard between 50th and 52nd Avenues, (Keene Concrete), Inspector: Bill Friend
  • Park Hill: 25th Avenue to Montview Boulevard between Colorado Boulevard and Dahlia Street, (Chato's Concrete), Inspector: Bill Friend
  • Park Hill: MLK Jr. Boulevard to 26th Avenue between Dahlia and Quebec Streets, (Chato's Concrete), Inspector: Bill Friend
  • Southmoor Park: Hampden to Mansfield Avenues between Dahlia to Monaco Parkway, (Keene Concrete), Inspector: Aaron McMichael
  • University Hills: Hampden to Yale Avenues between Colorado Blvd. and Holly Street, (Keene Concrete), Inspector: Aaron McMichael
  • Fort Logan/Bear Valley: Hampden to Quincy Avenues between S. Sheridan Boulevard and S. Newland Street, (Silva Construction), Inspector: Lawrence Alcaraz
  • Westwood and Mar Lee: Alameda Avenue to Florida Avenue between Sheridan and Federal Boulevards, (Silva Construction), Inspector: Lawrence Alcaraz

Week of February 29 - March 4 (weather permitting)

  • Lincoln Park/Baker: Alameda to Colfax Avenues between I-25 and Speer Boulevard, (Keene Concrete), Inspector: Bill Friend
  • Southmoor Park: Hampden to Mansfield Avenues between Dahlia to Monaco Parkway, (Keene Concrete), Inspector: Aaron McMichael
  • University Hills: Hampden to Yale Avenues between Colorado Blvd. and Holly Street, (Keene Concrete), Inspector: Aaron McMichael
  • Fort Logan/Bear Valley: Hampden to Quincy Avenues between S. Sheridan Boulevard and S. Newland Street, (Silva Construction), Inspector: Lawrence Alcaraz

February 22 - 26

  • Lincoln Park/Baker: ramp installations, asphalt and landscape repair from Alameda to Colfax Avenues between I-25 and Speer Boulevard, (Keene Concrete), Inspector: Bill Friend
  • Southmoor Park: ramp installations, asphalt and landscape repair from Hampden to Mansfield Avenues between Dahlia to Monaco Parkway, (Keene Concrete), Inspector: Aaron McMichael
  • Hampden South: asphalt repair and cleanup from Quincy to Union Avenues between Yosemite and Ulster Streets, (Keene Concrete), Inspector: Aaron McMichael
  • Virginia Village/Indian Creek: asphalt and landscape repair from Monaco Blvd. to Ulster St. between Iliff and Florida Avenues, (Fasick Construction), Inspector: Tim Cullen
  • Fort Logan/Bear Valley: ramp installations, asphalt and landscape repair from Hampden to Quincy Avenues between S. Sheridan Boulevard and S. Newland Street, (Silva Construction), Inspector: Lawrence Alcaraz

February 8 - 12

  • Lincoln Park/Baker: from Alameda to Colfax Avenues between I-25 and Speer Boulevard, (Keene Concrete), Inspector: Bill Friend
  • Southmoor Park:  from Hampden to Mansfield Avenues between Dahlia to Monaco Parkway, (Keene Concrete), Inspector: Aaron McMichael
  • Hampden South: asphalt repair and cleanup from Quincy to Union Avenues between Yosemite and Ulster Streets, (Keene Concrete), Inspector: Aaron McMichael
  • Virginia Village/Indian Creek: from Monaco Blvd. to Ulster St. between Iliff and Florida Avenues, (Fasick Construction), Inspector: Tim Cullen
  • Fort Logan/Bear Valley: from Hampden to Quincy Avenues between S. Sheridan Boulevard and S. Newland Street, (Silva Construction), Inspector: Gary Padilla

February 1 - 5

  • Lincoln Park/Baker: from Alameda to Colfax Avenues between I-25 and Speer Boulevard, (Keene Concrete), Inspector: Bill Friend
  • Southmoor Park:  from Hampden to Mansfield Avenues between Dahlia to Monaco Parkway, (Keene Concrete), Inspector: Aaron McMichael
  • Hampden South: asphalt repair and cleanup from Quincy to Union Avenues between Yosemite and Ulster Streets, (Keene Concrete), Inspector: Aaron McMichael
  • Virginia Village/Indian Creek: from Monaco Blvd. to Ulster St. between Iliff and Florida Avenues, (Fasick Construction), Inspector: Tim Cullen
  • Fort Logan/Bear Valley: from Hampden to Quincy Avenues between S. Sheridan Boulevard and S. Newland Street, (Silva Construction), Inspector: Gary Padilla

 
When to call the Curb Ramp Hotline

Phone: 720-460-9055

  • If you do not have an active project or do not know the name of your City Project Inspector or contractor
  • If you have reviewed the information on this site and still have questions
During business hours, our goal is to return calls promptly. Please allow some time for a response before calling other numbers provided on this site.