Public Works Plans Review Services Electronic Review

Electronic Review

This site is for use by review entities previously notified by the City and County of Denver of a electronic plan review opportunity.
The following links contain Project documents and are made available for authorized reviewing entities to review and submit comments. Updates will be posted as available, allowing applicants to obtain status on projects. Please click on the appropriate link below to access review documents for the corresponding Project Number

Folders:

 (Root)\

 2014-0700 Testing folder
 2014-0602-01_1st_Federal Blvd EA Tech Memo Water Quality (7th to Howard)
 2014-0588-01 MEP Curious Theatre Stairway 1080 Acoma St
 2014-0586-01_1st RTD - 16th Street Realignment at Market Street Station 60pcent
 2014-0584-01_1st PW Major Encroachment Process 30percent
 2014-0583-01_1st_Colorado Black Arts Festival
 2014-0571-01_1st_Little Box Car Enhanced Streetscape and Dog Run 60 percent
 2014-0568-01_1st Special Event Denver Cruisers Launch Party
 2014-0565-01_Special Event_Juneteenth Music Festival
 2014-0560-01_1st_Harvard Gulch Walk Replacement 2014
 2014-0554-04_1st Special Event PrideFest Dyke March
 2014-0554-03_1st_Special Event PrideFest Parade
 2014-0554-02_1st_Special Event_Big Gay 5K
 2014-0554-01_1st Special Event Denver PrideFest
 2014-0550-01_1st 20th and Chestnut Parking Lot 95percent
 2014-0547-01_1st Special Event Elevate Hope Chili Festival
 2014-0546-01_1st Washington Park Downing St Irrigation Improvements
 2014-0543-01_Special Event_ Five Points Jazz Festival
 2014-0542-01_1st_Special Event_Denver Flea
 2014-0540-01_1st_Denver Traffic Improvement Project 2013
 2014-0533-01_1st Denver TSSIP 2013-2014 95percent
 2014-0523-01_Special Event_Day of Rock
 2014-0515-01_1st Special Event Cinco De Mayo Festival and Parade
 2014-0511-01_1st Special Event The Bridal Dash
 2014-0510-01_1st Special Event Denver Chalk Art Festival
 2014-0505-01_1st_Special Event_InnovAge Moonlight Classic
 2014-0504-01_1st Special Event The Kinfolks Soul Food Festival
 2014-0496-01_1st_Country Club Neighborhood Median Islands_30 pcent
 2014-0494-01_2nd_Bear Creek Trail Replacement at Sheridan Blvd 100pcent
 2014-0494-01_1st_Bear Creek Trail Replacement at Sheridan Blvd 60 percent
 2014-0486-01_1st_INTERSECTION SAFETY PROJECT 2014- 01 Huston Lake 100 percent
 2014-0482-01_1st_NB University over Cherry Crk Bridge Rehab D-01-CC-281
 2014-0481-01_Special Event OhHeckYeah
 2014-0480-01_1st 18th St two way conversion Wynkoop to Blake 60percent
 2014-0479-01_Special Event_Cadence Union Station Grand Opening
 2014-0478-01_Special Event_Denver Union Station Bus Facility Grand Opening
 2014-0475-01_Special Event_Wings for LIfe World Run
 2014-0471-01_1st_Special Event_Tap N Run
 2014-0468-01_1ST_Special Event_Clinica Tepeyac Adelante 5K Walk and Run
 2014-0090-01_1st Special Event_Indian Wedding Festival
 2014-0089-01_1st Special Event Woof Fest
 2014-0083-01_1ST_CDOT 19671 - SH121 Wadsworth from Park Hill to Dartmouth
 2014-0080-01_1st_City Park Museum Road Phase 3C
 2014-0079-01_1st_Cherry Creek South Drive Phase 3-Steel to Garfield
 2014-0067-01_1st_Stapleton Northfield Campus
 2014-0065-01_2nd_BNSF Bridge 540.09 over South Platte River Replacement 100 Percent
 2014-0065-01_1st_BNSF Bridge 540.09 over South Platte River Replacement
 2014-0051-17 Dedication Public Alley between 25th 26th and Irving Julian
 2014-0045-01_1st_Grasmere Lake Habitat Improvements
 2014-0033-01_1st_Union Pacific Yard Office_95 percent
 2014-0026-01_1st_Sloan Lake Park 2014 Asphalt Walk Replacement
 2014-0019-05_Teleport RMWT 5200 Deephaven Ct
 2014-0019-04_Teleport RMWT 8720 E Colfax
 2014-0019-03_Teleport RMWT 2242 Stout
 2014-0019-02_ Teleport-RMWT 3000 First Ave
 2014-0014-12 Zayo RMWT Belleview and Yosemite
 2014-0014-08 Zayo Power Engineers 1001 E Bayaud
 2014-0003-06 Comcast Sage 200 Josephine St
 2014-0003-05 Comcast Sage 194 W. Dakota
 2014-0002-07 Xcel UC Synergetic 6550 E. 21st Ave
 2014-0002-03_2nd Xcel UC Synergetic 52nd and Steele
 2014-0002-03 Xcel UC 52nd and Steele
 2013-MEP-000082
 2013-0607-01_2nd_Triangle Park Improvements 95percent
 2013-0607-01_1st_Triangle Park Improvements 60pcent
 2013-0604-01_3rd Denver Water Vault Modifications 95 Percent
 2013-0604-01_2nd Denver Water Vault Modifications_60pcent
 2013-0604-01_1st Denver Water Vault Modifications_30pcent
 2013-0588-02 Vacate Kensing Ct btwn 1615 Boulder St and Hirshorn Park
 2013-0588-01 Vacate Alley btwn 1615 Boulder St and Hirshorn Park
 2013-0585-01 Vacation 3124 W 20th
 2013-0574-02 MEP Metro State University Sports Private sanitary
 2013-0562-01_3rd_MWRD Sand Creek Interceptor Repair
 2013-0562-01_2nd MWRD Sand Creek Interceptor Repair
 2013-0548-02 Easement Relinquishment W 28th Ave and Vallejo St
 2013-0547-01_Dedication
 2013-0534-01_1st Red Rocks ADA Toilet rooms and landscape 100 percent
 2013-0518-01_3rd_Proprietary Underground Water Quality Devices 100 Percent
 2013-0518-01_2nd Proprietary Underground Water Quality Devices Policy Review 100 Percent
 2013-0511-01_Dedication
 2013-0510-01_Dedication
 2013-0503-01_2nd Ruby Hill Park Phase II 60percent
 2013-0503-01_1st_Ruby Hill Park Phase II_Parks_30 Percent
 2013-0472-06 Mariposa Phase 6 Vacation
 2013-0459-01 MEP Delmonico 3879 Tennyson st
 2013-0454-01_1st Cherry Creek Drop Structure 16A 30 percent
 2013-0447-01_2nd CDOT US-40 Clarkson-Colorado 95percent
 2013-0447-01_1st CDOT US-40 Clarkson-Colorado
 2013-0433-01_2nd 2014 General Strom 95percent
 2013-0433-01_1st 2014 General Storm 60 percent
 2013-0431-04 MEP Alexan at Sloans Lake
 2013-0426-01_1st SPUI Traffic Signal Upgrade Evans Bridge at S Santa Fe Dr 30 percent
 2013-0412-01 Vacation Tabor II 17th and Larimer
 2013-0392-01_1st_CDOT 19339 I-70 over Havana St DesignBuild Bridge replace
 2013-0391-02 MEP 1510 Market St
 2013-0388-01_1st_Overhead Sign Bridge Project Phase IIIA_CPEP_30 Percent
 2013-0386-01_2nd Confluence Bike Ped Ramps_Parks 60 Percent
 2013-0385-01_2nd_Mill Levy Package 4 - Phase 1 Traffic signal Upgrade
 2013-0373-01_1st First Creek Restoration - Tower Rd to Pena Blvd 30 percent
 2013-0364-01_2nd Denver Water 15143A - Conduit No. 74 Relocation 90 Percent
 2013-0364-01_1st Denver Water 15143A - Conduit No. 74 Relocation 30 percent
 2013-0351-01_1st City Park Pavilion Parking Lot Renovation 90 percent
 2013-0345-01_1st CDOT W. Colfax Ave Federal to Speer Bv
 2013-0340-01_1st 2013 Floodplain Ordinance Rules Regs Update
 2013-0313-01_3rd Denver Water C118-74 Reconfiguration Project 90 percent
 2013-0303-04 Easement Relinquishment Rosemark 5809 E 8th Ave
 2013-0286-01_2nd Westerly Creek Channel Restoration Reach 2 90 percent
 2013-0283-03 Vacation 24th Ave Bryant and Clay St
 2013-0249-01_1st Rules and Regs Sidewalk Curb Ramp Construction PW Policy Review Final
 2013-0236-01 Vacation 4696 N Grove St
 2013-0226-15_2nd Stapleton Filing 45-P-10 Parks Bridges 95 Percent
 2013-0226-15_1st_Stapleton Filing 45-P-10 Parks bridges
 2013-0226-13_4th_Stapleton Filing 45-P-10 100 Percent
 2013-0226-13_3rd_Stapleton Filing 45 P-10
 2013-0222-01_1st 52nd and Emerson Regional Water Quality Feature
 2013-0192-01_2nd Sand Creek Regional Greenway-47th Underpass to I-70 100 percent
 2013-0166-01_2nd Special Event
 2013-0149-01_1st_2013 General Storm - Monaco Pkwy CPEP
 2013-0144-01_4th_Public Infrastructure 38th and Blake Station TOD Sidewalks 100 percent
 2013-0144-01_3rd Public Infrastructure 38th and Blake Station sidewalks 95percent
 2013-0136-04_2nd E.R Auraria Campus Block 257
 2013-0135-01_2nd Peoria Crossing Design build 95percent Xref 2011-0101-25
 2013-0133-04 MEP Platt Park North Development
 2013-0123-10 Vacation at East Colfax Marketplace
 2013-0123-09 Vacation East Alley Colfax Marketplace - Colfax and Corona
 2013-0123-07 MEP Colfax Marketplace - Route 40
 2013-0123-05 Vacation Colfax Marketplace - Colfax and Corona
 2013-0097-01_1st Denver Water 14193A - Conduit 94, 125 and 72 repairs
 2013-0078-01_3rd Denver Water 14624A - Vault Modification 2013-2014 90 percent
 2013-0075-01_3rd_DENVER PROJECT REVIEW_Governors Park Grant Humphries Mansion Irrigation 95 percent
 2013-0068-01 MEP Auraria Streetscape 2nd submittal
 2013-0049-01_4th Stapleton Filing P-9 100 percent
 2013-0045-01_1st Platte River Imp Vanderbilt and Johnson Park Riverfront 30 percent
 2013-0044-01_5th Platte River Improvements Grant Frontier to Alameda Final
 2013-0044-01_4th Platte River Improvements Grant Frontier to Alameda 100pcent
 2013-0026-78 Zayo EDM Martin Luther King Jr Blvd and Quebec St
 2013-0026-72 Zayo EDM S. Wadsworth Blvd and W. Yale Ave
 2013-0026-70 Zayo RMWT 200 16th St
 2013-0026-69 Zayo Safe Site 7200 Hampden Ave
 2013-0026-65 Zayo_2nd EDM S Locust and Yale Ave
 2013-0026-60_2nd Zayo EDM Evans from Oneida to Syracuse
 2013-0026-60_1st Zayo EDM Evans from Oneida to Syracuse
 2013-0026-41 Zayo EDM W. Darmouth Ave and S. Federal Blvd
 2013-0026-21 Zayo EDM Girard Ave and S. Galena St
 2013-0026-12 ZAYO EDM E Evans Ave S Dahlia and S Oneida St
 2013-0026-01 ZAYO Kenyon Ave
 2013-0014-89_2nd Zayo EDM W Bayaud btwn S Kalamath and S Galapago St
 2013-0014-89 Zayo EDM W Bayaud btwn S Kalamath and S Galapago St
 2013-0014-77 ZAYO W 38th Ave betw Zuni and Osage St
 2013-0012-07 ATT RMWT Teleport Comm 3435 W 41st Ave
 2013-0012-05 ATT 3435 W 41st Ave
 2013-0012- 04 ATT 2001 Colorado Blvd
 2013-0005-07 TW Telecom DASO 8950 Lowry Blvd
 2013-0003-55 CPI Comcast 18650 E 45th Ave
 2013-0003-52 Comcast 1301 Pennsylvania St
 2013-0003-49 Comcast 3001 Brighton Blvd
 2013-0003-30 Comcast 3555 Colorado Blvd
 2013-0002-84 XCEL E 4th and Circle Dr
 2013-0002-83 Xcel UCS Dahlia St 48th to Smith
 2013-0002-60 Q3 19th and Wewatta St
 2013-0001-68 CenturyLink 4895 Joliet St
 2012-0486-09 Easement Relinquishment South Sloans Lake
 2012-0486-08 MEP South Sloans Lake
 2012-0478-01_4th George Washington High School Trail_90 Percent
 2012-0467-01 56th Ave Conceptual Plans Pena Blvd to Tower Rd CPEP
 2012-0459-01 Vacation 4451 Cahita Ct
 2012-0440-01_3rd Huston Lake Water Quality
 2012-0425-01_3rd_Denver Water C14421A 2013 Pipe Rehabilitation Project_95 Percent
 2012-0421-01_3rd Jeffco 5-69-10-3783 Quincy Ave Recon
 2012-0421-01_2nd Jeffco 5-69-10-3783 Quincy Ave Recon
 2012-0381-02_1st_Platte Farm Open Space
 2012-0363-06 2nd submittal MEP UCD Academic building 1
 2012-0363-05 MEP Auraria Campus Auraria Pkwy and Speer Blvd
 2012-0350-01_1st Vacation 740-744 Hazel Ct
 2012-0346-01_2nd South Platte Gateway Mountain Bike Trails Parks 60 percent
 2012-0313-07_Dedication Logan St, Grant St, 7th Ave and 6th Ave
 2012-0309-01_4th Westwood Alameda Park 100 percent
 2012-0295-02 Vacation 360 S Monroe St
 2012-0257-01_1st RTD Civic Center Station Restoration TEP
 2012-0247-02_2nd_Lower Westerly Creek Flood Control Improvement at Montview 30 percent
 2012-0247-02_1st Lower Westerly Creek Flood Control Improvement at Montview 15 percent design
 2012-0214-01_2nd 31st and 36th Outfall CPEP 60 percent
 2012-0185-02_2nd_City Park Museum Traffic Circle 100 percent
 2012-0163-01_6th_South Jason Street Maintenance Facility 100 percent
 2012-0163-01_5th S Jason St Maint Facility Parks 100 percent
 2012-0107-02 Vacation Metro State Sports Complex
 2012-0030-06_3rd_Reports_CDOT 18838 US 6 Bridges Trans Management Plan 100 percent
 2012-0030-06_2nd_Reports_CDOT 18838 - US Bridges design Build Project (Knox to I-25)
 2012-0030-06_1st_Reports_CDOT 18838 - US 6 Bridges Design Build Project (Knox to I-25) Transportation Management Plan
 2012-0030-05_1st_Structures_CDOT 18838 Structures US 6 Knox to I-25
 2012-0030-04_4th_ CDOT US 6 Bridges -Civil 90 Percent Drainage and Stuctures 100 Percent
 2012-0030-04_3rd Civil_CDOT 18838 US 6 Bridges Design Build (Knox to I-25) Sanitary Re-route
 2012-0030-04_2nd_Civil_CDOT 18838 - US 6 Bridges Design Build (Knox to I-25) Civil 60 Percent
 2012-0030-03_8th_Parks CDOT 18838 - Parks US 6 Bridges - 100percent RFC Knox to I-25
 2012-0030-03_7th_Parks CDOT 18838 - Parks US 6 Bridges - 5th Ave Final Acceptance
 2012-0030-03_6th_Parks CDOT 18838 Phase II US Bridges Project
 2012-0030-03_5th_Parks_CDOT 18838 US 6 Bridges Design Build 5th Ave 100 percent
 2012-0030-03_4th_Parks_CDOT 18838 US 6 Bridges Design Build Parks Phase 1 100 percent
 2012-0030-03_3rd_Parks_CDOT 18838 - US 6 Bridges Design Build Project (Knox to I-25)
 2012-0030-03_2nd_Parks_CDOT 18838 US 6 Bridges Design Build Knox to I 25 90 percent
 2012-0024-01_2nd_Parks Revised Construction Specifications 95 percent
 2011-0622-01_5th_RTD Downtown Denver Circulator 60 Percent
 2011-0622-01_4th RTD Downtown Denver Circulator IFC
 2011-0621-01_2nd Capital Trans Project Template Specs
 2011-0595-01_4th Evergreen Golf Course Bridge Replacement FINAL
 2011-0595-01_3rd Evergreen GC Bridge Replacement 100 percent
 2011-0580-06_2nd Dedication 29th and Huron Apartments
 2011-0571-03_4th Dakota Outfall Phase 2 final 100percent
 2011-0568-01_7th Cherry Creek Pedestrian Bridge at Kentucky Ave 100 Percent
 2011-0567-05 MEP St. Joseph Signage
 2011-0567-04 MEP St. Josephs
 2011-0561-07 MEP Broadstone 9th and Clearmont
 2011-0561-04 Easement Relinquish 8th Ave and Birch St
 2011-0489-02_1st_16th Street Mall Reconstruction Blocks 1, 2, 12 and 13
 2011-0477-03 MEP 1500 Wewatta
 2011-0426-01_3rd Hampden Heights Storm Sewer Imp Phase II 95percent
 2011-0103-01_1st 61st and Pena Station Supplemental
 2011-0100-22_8th Fastracks Bridge Attachment Design
 2010-0517-02_3rd High Street Outfall and 40th Ave System-Ph 2 Storm 100 percent
 2010-0517-02_2nd High Street Outfall and 40th Ave System-Ph 2 Storm 95 percent
 2010-0456-01_3rd_Kennedy Ball Fields Detention Rehab 95percent
 2010-0446-04_1st_North University Outfall CCN - Phase II -5 Percent
 2010-0271-01_4th S Holly and Pacific Place Outfall to Goldsmith Gulch 100 percent
 2010-0217-03_Dedication Quincy and Pierce
 2010-0165-05_4th South Broadway and I-25 interchange CPEP 100 percent
 2010-0087-01_8th Park Hill Storm Ph IV B 100 percent
 2009-0617-01_17th Submittal Denver Bike Sharing at 615 17th St
 2009-0617-01_16th Submittal Denver Bike Sharing at 2417 W 29th Ave
 2009-0066-09_1st_I-25 Santa Fe Interchange Water Quality and DrainageFinal Reports
 2009-0066-08_2nd_-25 Santa Fe Drive Construction Bid Plans and Specs 100 Percent
 2009-0066-08_1st_I-25 Santa Fe Drive Construction Bid Plans and Specs_100 percent
 2009-0066-07_1st CDOT - Alameda I-25 Bridge As-Builts

Feedback