Contract 202055847 Grays Peak General Storm

Closing date February 25, 2021, 11:00 AM

  • Reference numberContract 202055847
  • StatusOpen
  • SummaryCitywide general storm projects are intended to mitigate localized flooding and drainage issues. This project will include new storm systems that tie into existing storm mains.

General Statement of Work

Citywide general storm projects are intended to mitigate localized flooding and drainage issues. This project will include new storm systems that tie into existing storm mains. Other work will include the relocation/lowering of Denver Water water distribution mains and a large diameter water conduit line. Surface restoration will also be included in the project scope and will include concrete flatwork, asphalt paving and landscape restoration.

Also, please note that Contractor must abide by Denver Water's outage dates for the transmission line lowering in Steele. Refer to Standard Specifications for Conduit No. 54 Lowering at South Steele Street and East Ellsworth Avenue in the technical specifications.

Statement of Quantities(PDF, 371KB)

Estimated Construction Cost: Between $4,400,000.00 and $4,800,000.00

Virtual Pre-Bid Meeting on January 21, 2021 at 9:30 a.m.

To access the meeting, please call 720-388-6219 and enter conference ID: 604 038 932#

Pre-Bid Meeting Agenda(PDF, 303KB)

Sign-In Sheet(PDF, 167KB)

Questions Deadline: February 2, 2021 at 10:00 a.m. local time

Bid Opening on February 25, 2021 at 11:00 a.m.

Bids will be received and accepted via the online electronic bid service, www.QuestCDN.com and will be read aloud. To access the bid opening teleconference, please call 720-388-6219 and enter conference ID: 604 038 932#. To submit responses, click the online bidding button at the top of advertisement. Contractors must be on the plan holders list through QuestCDN for proposals to be accepted. Contractors will be charged a fee of $30.00 to submit a proposal electronically.

Plans Available January 12, 2021

Digital Download

QuestCDN Project # 7467489

Plan Cost: $15.00

MWBE Goal: 15%

Prequalification: 1E(4) Piped Sewer at or above the $6,000,000.00 monetary level

Contract Administrator: Jennifer Clark

pw.procurement@denvergov.org

Miscellaneous 

Contracts for construction, reconstruction, and remodeling are subject to the City prevailing wage rate requirements established pursuant to Section 20-76, D.R.M.C. 

City contracts are subject to payment of City Minimum Wage established pursuant to Section 20-82 through 20-84 D.R.M.C.

As the City’s best interests may appear, the Executive Director of the Department of Transportation and Infrastructure reserves the right to waive informalities in, and to reject any or all, submittals.

Publication Dates:           January 12, 13, 14, 2021

Published In:                    The Daily Journal