2022xxxxx 2022 Wastewater Infrastructure Program Support

Closed September 22, 2022, 02:00 PM

  • Reference numberContract 2022xxxxx
  • StatusPending
  • SummaryA 2-year long contract designed to support the implementation of the Wastewater Infrastructure Improvement Projects and/or Programs.

General Statement of Work

A 2-year long contract designed to support the implementation of the Wastewater Infrastructure Improvement Projects and/or Programs. Work performed will include but is not limited to: replacement of sanitary and storm sewer infrastructure; Infrastructure Program systems support and/or development; cured-in-place lining for water, storm, and sanitary infrastructure; work in open channel waterways; environmental site investigation and/or early construction activities; negotiating early site access and agreements; structural rehabilitation of manholes, inlets, and other wastewater infrastructure, installation or stabilization of concrete flatwork, street infrastructure, or subgrades; promoting storm drainage in the City Right-of-way, City parks, or other City owned facilities and land; utility relocation and coordination; compliance with regulations including the American Disability Act; other work to satisfy City obligations under State, Federal, and Army Corp issued permits or other City agreements associated with Infrastructure Projects involving new construction, water quality, and drainage way improvements. This contract will be composed of multiple events and used on an as-needed basis. Contract term is two years and the maximum contract amount is $2,000,000.00 (contract amount is no guarantee of work). This contract may be awarded to multiple bidders.

Statement of Quantities(PDF, 277KB)

Estimated Construction Cost: The Engineers Estimate for total bid amount (Supplemental Labor, Supplemental Work, Allowance Accounts, and $5,850 Textura Fee) is between $3,000,000.00 and $3,300,000.00. The maximum contract amount is $2,000,000.00. The maximum amount to be paid for all work performed under this contract shall in no event exceed the sum of $2,000,000.00.

Virtual Pre-Bid Meeting on August 11, 2022 at 9:30 a.m.

To access the meeting, please call (720) 388-6219 and enter conference ID: ­­­­951 652 744#. Click here to join meeting.

Pre-Bid Meeting Agenda(PDF, 293KB)

Sign-in Sheet(PDF, 131KB)

Questions Deadline: August 18, 2022 at 10:00 a.m. local time

NEW DATE: Bid Opening on September 22, 2022 at 2:00 p.m.

Bids will be received and accepted via the online electronic bid service, www.QuestCDN.com and will be read aloud. To access the bid opening teleconference, please call (720) 388-6219 and enter conference ID: ­­­­681 941 817#. Click here to join meeting. To submit responses, click the online bidding button at the top of advertisement. Contractors must be on the plan holders list through QuestCDN for proposals to be accepted. Contractors will be charged a fee of $30.00 to submit a proposal electronically.

Plans Available July 27, 2022

Digital Download

QuestCDN Project # 8254400

Plan Cost: $15.00

MWBE Goal: 7%

Prequalification: 1E(4) Piped Sewer at or above the $3,000,000.00 monetary level

Contract Administrator: Michele Foust

doti.procurement@denvergov.org

Miscellaneous

Contracts for construction, reconstruction, and remodeling are subject to the City prevailing wage rate requirements established pursuant to Section 20-76, D.R.M.C.

City contracts are subject to payment of City Minimum Wage established pursuant to Section 20-82 through 20-84 D.R.M.C.

As the City’s best interests may appear, the Executive Director of the Department of Transportation and Infrastructure reserves the right to waive informalities in, and to reject any or all, submittals.

Publication Dates:           July 27, 28, 29, 2022