Contract 202366921 2023 WMD Pipe Rehabilitation, Phase 1

Closed April 13, 2023, 11:30 AM

  • Reference numberContract 202366921
  • StatusAwarded
  • SummaryThe purpose of this project is to rehabilitate approximately 69,000 LF of sanitary and storm pipe with diameters ranging from 8" to 30" using trenchless technology.
  • Winning entity
    SAK Construction, LLC
  • Value$4,062,724.00

General Statement of Work

The purpose of this project is to rehabilitate approximately 69,000 LF of sanitary and storm pipe with diameters ranging from 8" to 30" using trenchless technology. The liner will be installed through existing manholes and shall extend the full length of the original pipe and provide a structurally sound, jointless and water-tight new pipe-within-a-pipe. Work will include pre- and post-cleaning and CCTV, QC testing, reinstatement of services, bypass pumping as necessary, and traffic control. Most of the work will take place in the Lincoln Park and Harvey Park neighborhoods with minor work Citywide.

Statement of Quantities(PDF, 123KB)

Addendum #1(PDF, 222KB)

Estimated Construction Cost: Between $4,000,000.00 and $4,400,000.00

Virtual Pre-Bid Meeting on March 14, 2023 at 2:00 p.m.

To access the meeting, please call (720) 388-6219 and enter conference ID: 219 121 349# or join via Click here to join the meeting

Pre-Bid Meeting Agenda(PDF, 323KB)

Sign-in Sheet(PDF, 146KB)

Questions Deadline: March 22, 2023 at 2:00 p.m. local time

Bid Opening on April 13, 2023 at 11:30 a.m.

Bids will be received and accepted via the online electronic bid service, www.QuestCDN.com and will be read aloud. To access the bid opening teleconference, please call (720) 388-6219 and enter conference ID: 283 968 300# or join via Click here to join the meeting To submit responses, click the online bidding button at the top of advertisement. Contractors must be on the plan holders list through QuestCDN for proposals to be accepted. Contractors will be charged a fee of $30.00 to submit a proposal electronically.

Plans Available March 3, 2023

Digital Download

QuestCDN Project # 8406302

Plan Cost: $15.00

MWBE Goal: 10%

Prequalification: 1E(2) Sewer Rehabilitation at or above the $6,000,000.00 monetary level

Contract Administrator: Michele Foust: DOTI.Procurement@denvergov.org

Prevailing Wage and Minimum Wage: Contracts for construction, reconstruction, and remodeling are subject to the City prevailing wage rate requirements established pursuant to Section 20-76, D.R.M.C. City contracts are subject to payment of City Minimum Wage established pursuant to Section 20-82 through 20-84 D.R.M.C.

As the City’s best interests may appear, the Executive Director of the Department of Transportation and Infrastructure reserves the right to waive informalities in, and to reject any or all, submittals.

Publication Dates:       March 3, 6, 7, 2023

Published In:               The Daily Journal