2024 Citywide ADA Ramp & Concrete Repair A

Closed March 14, 2024, 11:00 AM

  • Reference numberContract 202472628
  • StatusPending
  • SummaryThe work will consist of removal of deficient concrete ADA ramps, curbs, gutters, sidewalk panels, valley gutters, concrete streets, and alley pavement.

General Statement of Work

The work will consist of removal of deficient concrete ADA ramps, curbs, gutters, sidewalk panels, valley gutters, concrete streets, and alley pavement. The concrete will be replaced to restore the structure to its original condition. If the asphalt pavement is damaged during construction the surrounding area will be removed and replaced with new asphalt. If landscaping and/or sprinklers are damaged during construction, they will be replaced.

Statement of Quantities(PDF, 130KB)

Estimated Construction Cost: Between $2,250,000.00 and $2,750,000.00.

Virtual Pre-Bid Meeting on February 21, 2024 at 1:00 p.m.

To access the meeting, please call (720) 388-6219 and enter conference ID: 629 840 539# or join via Microsoft Teams Link.

Sign-in Sheet(PDF, 227KB)

Questions Deadline: February 28, 2024 at 3:00 p.m. local time

Bid Opening on March 14, 2024 at 11:00 a.m.

Bids will be received and accepted via the online electronic bid service, www.QuestCDN.com and will be read aloud. To access the bid opening teleconference, please call (720) 388-6219 and enter conference ID: ­­­­553 795 053# or join via Microsoft Teams Link. To submit responses, click the online bidding button at the top of advertisement. Contractors must be on the plan holders list through QuestCDN for proposals to be accepted. Contractors will be charged a fee of $30.00 to submit a proposal electronically.

Plans Available February 12, 2024

Digital Download

QuestCDN Project # 8960984

Plan Cost: $15.00

SBE Goal: 30%

Prequalification: 1F(3) Concrete Sidewalk, Curb, Gutter and ADA Ramps at or above the $3,000,000.00 monetary level

Contract Administrator: Micaela Martinez, DOTI.Procurement@denvergov.org

Prevailing Wage and Minimum Wage: Contracts for construction, reconstruction, and remodeling are subject to the City prevailing wage rate requirements established pursuant to Section 20-76, D.R.M.C. City contracts are subject to payment of City Minimum Wage established pursuant to Section 20-82 through 20-84 D.R.M.C.

As the City’s best interests may appear, the Executive Director of the Department of Transportation and Infrastructure reserves the right to waive informalities in, and to reject any or all, submittals.

Publication Dates:       February 12, 13, 14, 2024

Published In:               The Daily Journal