Torreys Peak General Storm

Closed June 27, 2024, 11:00 AM

  • Reference numberContract 202473941
  • StatusAwarded
  • SummaryThe goal of the Ellsworth Ave. Storm project is to improve drainage and mitigate ponding, icing, and flooding that occurs on Ellsworth Ave. during storm events.
  • Winning entity
    Concrete Works of Colorado, Inc.
  • Value$3,838,248.72
  • Date awardedSeptember 30, 2024

General Statement of Work

The goal of the Ellsworth Ave. Storm project is to improve drainage and mitigate ponding, icing, and flooding that occurs on Ellsworth Ave. during storm events. Phase 1 was the downstream end of the project from Steele to Cook St. in the Cherry Creek East neighborhood and was completed in 2022. Phase 2 will take off where Phase 1 left off, just west of Madison on Ellsworth Ave., and will continue two and a half blocks to Garfield St. Storm mains ranging from 24” to 36” RCP and 53”x34” HERCP, laterals, manholes, and inlets will be installed to intercept flows. Ellsworth will be regraded and repaved to eliminate flat areas that currently experience ponding and icing. Work will also include waterline adjustments and improvements to sidewalks, curb and gutter, curb ramps, and driveways.

Statement of Quantities (Revised)(PDF, 128KB)

Addendum #1(PDF, 604KB)

Estimated Construction Cost: Between $4,000,000.00 and $4,400,000.00

Virtual Pre-Bid Meeting on May 23, 2024 at 10:00 a.m.

To access the meeting, please call (720) 388-6219 and enter conference ID: ­­­­961 003 183# or join via Join the meeting now.

Meeting Agenda(PDF, 289KB)

Questions Deadline: June 10, 2024 at 3:00 p.m. local time

Bid Opening on June 27, 2024 at 11:00 a.m.

Bids will be received and accepted via the online electronic bid service, www.QuestCDN.com and will be read aloud. To access the bid opening teleconference, please call (720) 388-6219 and enter conference ID: ­­­­216 548 804# or join via Join the meeting now. To submit responses, click the online bidding button at the top of advertisement. Contractors must be on the plan holders list through QuestCDN for proposals to be accepted. Contractors will be charged a fee of $30.00 to submit a proposal electronically.

Plans Available May 15, 2024

Digital Download

QuestCDN Project # 9114427

Plan Cost: $15.00

MWBE Goal: 14%

Prequalification: 1E(4) Piped Sewer at or above the $6,000,000.00 monetary level

Contract Administrator: Cheryl Booker: DOTI.Procurement@denvergov.org

Prevailing Wage and Minimum Wage: Contracts for construction, reconstruction, and remodeling are subject to the City prevailing wage rate requirements established pursuant to Section 20-76, D.R.M.C. City contracts are subject to payment of City Minimum Wage established pursuant to Section 20-82 through 20-84 D.R.M.C.

As the City’s best interests may appear, the Executive Director of the Department of Transportation and Infrastructure reserves the right to waive informalities in, and to reject any or all, submittals.

Publication Dates:       May 15, 16, 17, 2024

Published In:               The Daily Journal