East 16th Avenue Storm Phase 2

Closing date October 15, 2024, 11:00 AM

  • Reference numberContract 202475601
  • StatusOpen
  • SummaryThe East 16th Avenue Storm Phase 2 project is the second phase of an effort to extend and upsize the storm system in the Montclair Basin to relieve frequent and significant flooding in the neighborhood.

General Statement of Work

The East 16th Avenue Storm Phase 2 project is the second phase of an effort to extend and upsize the storm system in the Montclair Basin to relieve frequent and significant flooding in the neighborhood. The downstream end of the project will tie into an existing box in Albion Street just south of East 17th Avenue that crosses Colorado Boulevard and outfalls into Ferril Lake. The new storm drain will extend east in Batavia via an elliptical Hobas pipe. Work will also include full roadway reconstruction, full utility reconstruction, and improvements to the existing system on Batavia Place between Colorado Boulevard and Albion Street. One alternate to the bid will continue the system east in Batavia from just east of Bellaire Street to just east of Clermont Street.

Planholder List / Solicitation Document Report(PDF, 2MB)

Statement of Quantities can be found in BidNet

Estimated Construction Cost: Between $10,400,000.00 and $11,200,000.00

Virtual Pre-Bid Meeting on September 17, 2024 at 1:00 p.m.

To access the meeting, please call (720) 388-6219 and enter conference ID: 454 522 882­­­­# or join via Microsoft Teams Link.

Questions Deadline: September 24, 2024 at 2:00 p.m. local time

Bid Opening on October 15, 2024 at 11:00 a.m.

Bids will be received and accepted via the online electronic bid service, Rocky Mountain E-Purchasing (“BidNet”), www.bidnetdirect.com/colorado/cityandcountyofdenver and will be read aloud. To access the bid opening teleconference, please call (720) 388-6219 and enter conference ID: 921 812 15# or join via Microsoft Teams Link.

MWBE Goal: 15%

Prequalification: 1E(4) Piped Sewer at or above the $12,000,000.00 monetary level

Contract Administrator: Micaela Martinez: DOTI.Procurement@denvergov.org

Prevailing Wage and Minimum Wage: Contracts for construction, reconstruction, and remodeling are subject to the City prevailing wage rate requirements established pursuant to Section 20-76, D.R.M.C. City contracts are subject to payment of City Minimum Wage established pursuant to Section 20-82 through 20-84 D.R.M.C.

As the City’s best interests may appear, the Executive Director of the Department of Transportation and Infrastructure reserves the right to waive informalities in, and to reject any or all, submittals.

Publication Dates:       September 3, 4, 5, 2024

Published In:               The Daily Journal