Marston Lake North Upstream of Glenbrook Pond Phase 2

Closing date October 24, 2024, 11:00 AM

  • Reference numberContract 202475774
  • StatusOpen
  • SummaryThe storm drain system improvements in the Marston Lake North Drainageway aim to separate stormwater flows from the Bowles Lateral irrigation ditch, improve drainage and alleviate high groundwater near the properties adjacent to Bowles Lateral at Saratoga Place, and improve the overall drainage and reduce street flow through the project area.

General Statement of Work

The storm drain system improvements in the Marston Lake North Drainageway aim to separate stormwater flows from the Bowles Lateral irrigation ditch, improve drainage and alleviate high groundwater near the properties adjacent to Bowles Lateral at Saratoga Place, and improve the overall drainage and reduce street flow through the project area. The new storm system will collect and convey flows from West Wagon Trail and South Field Way to the existing storm drain system downstream of the Glenbrook Pond. The project was separated into two phases. Phase 1 was competed in 2023 and separated storm flows from the Bowles Lateral with the improvements. Phase 2 will tie into the upstream end of Phase 1 and includes the installation of 30-inch to 42-inch and 34x53-inch elliptical storm main, storm laterals, inlets, and manholes. Waterline adjustments, curb Ramps, curb, gutter, and sidewalk replacement, as well as street restoration are also included.

Solicitation Document Report(PDF, 2MB)

Estimated Construction Cost: Between $2,900,000.00 and $3,200,000.00

Virtual Pre-Bid Meeting on September 24, 2024 at 1:00 p.m.

To access the meeting, please call (720) 388-6219 and enter conference ID: 592 001 949# or join via Join the meeting now.

Meeting Agenda(PDF, 292KB)

Questions Deadline: October 1, 2024 at 10:00 a.m. local time

Bid Opening on October 24, 2024 at 11:00 a.m.

Bids will be received and accepted via the online electronic bid service, Rocky Mountain E-Purchasing (“BidNet”). Prospective bidders must be on the plan holders list at BidNet for bids to be accepted. To access the electronic bid form, download the required documents from BidNet and complete the Unit Item Pricing in the Documents & Items section of the solicitation. All properly uploaded bids will then be opened, witnessed and read aloud. To access the bid opening teleconference, please call (720) 388-6219 and enter conference ID: 459 094 768# or join via Join the meeting now.

Plans Available September 16, 2024

Digital Download on BidNet ; reference Solicitation No. 202475774

MWBE Goal: 14%%

Prequalification: 1E(4) Piped Sewer at or above the $6,000,000.00 monetary level

Contract Administrator: Cheryl Booker: DOTI.Procurement@denvergov.org

Prevailing Wage and Minimum Wage: Contracts for construction, reconstruction, and remodeling are subject to the City prevailing wage rate requirements established pursuant to Section 20-76, D.R.M.C. City contracts are subject to payment of City Minimum Wage established pursuant to Section 20-82 through 20-84 D.R.M.C.

As the City’s best interests may appear, the Executive Director of the Department of Transportation and Infrastructure reserves the right to waive informalities in, and to reject any or all, submittals.

Publication Dates:       September 16, 17, 18, 2024

Published In:               The Daily Journal