Following bid openings, the bids will be summarized and posted, generally within two (2) business days of the advertised opening. Bid tabulations are posted once the City has received a signed contract from the apparent low bidder. Bid tabulations are not posted if it was a lump sum bid. For those, refer to the Bid Summary.
Line item analysis of each bidder's proposal. Lump sum bids are posted under Bid Summaries.
Project |
Amount |
Awarded Firm(s) |
202474276 - S. Platte River Drive Improvements, Virginia to Bayaud(PDF, 2MB) |
$8,152,300.00 |
Ames Construction, Inc. |
202474414 - 2024 WMD Pipe & Manhole Rehabilitation Phase 2(PDF, 402KB) |
$4,709,119.20 |
Insituform Technologies, LLC |
202473941 - Torreys Peak General Storm(PDF, 383KB) |
$3,838,248.72 |
Concrete Works of Colorado, Inc. |
202473378 - General Storm: S Hazel Ct and W Iowa Ave(PDF, 377KB) |
$4,332,423.00 |
Hamon Infrastructure, Inc. |
202472434 - 2024 Hot-in-Place Recycling and Repaving(PDF, 829KB) |
$4,190,297.00 |
Cutler Repaving, Inc. |
202472279 - 2024 Street Maintenance Contract Mill & Overlay(PDF, 282KB) |
$2,918,029.25 |
Brannan Sand and Gravel Co, LLC |
202472432 - 2024 Citywide ADA Ramp and Concrete Repair C(PDF, 113KB) |
$2,697,005.00 |
Keene Concrete, Inc. |
202472240 - 2024 Citywide Chip Seal and Crack Seal(PDF, 121KB) |
$3,540,832.50 |
Vance Brothers, Inc. |
202472629 - 2024 WMD Pipe & Manhole Rehabilitation, Phase 1(PDF, 120KB) |
$5,388,007.60 |
Insituform Technologies, LLC |
202472080 - 2024 Citywide ADA Ramp & Concrete Repair B(PDF, 126KB) |
$2,385,837.50 |
Keene Concrete, Inc. |