Upcoming Projects

Formal Procurements

Professional Services (Projected)

Q1 2024

  • N/A

Construction Services (Projected) 

Q1 2024

  • Jewell Ave Pedestrian/Bicycle Bridge
    Improve pedestrian and bicycle connectivity and safety when crossing Santa Fe Drive
  • Rose Andom - Security and Access Control
    Security and Access Control
  • General Storm - Longs Peak
    A neighborhood storm system and sidewalk construction project.
  • Iowa Underpass Mobility Enhancement
    Reconstruct pedestrian pathway along W. Iowa Ave. between S. Acoma St. & S. Santa Fe Drive by removing existing stairway and constructing new ADA-accessible pathway and associated retaining walls.
  • Federal Boulevard Transit Speed and Reliability Project
    Speed and reliability improvements
  • Heron Pond Carpio Sanguinette Phase 2 Park
    Water quality, stormwater and park improvements at Carpio Sanguinette Park.
  • 2024 Citywide ADA Ramp & Concrete Repair C
    Removal and Replacement of deficient concrete curbs, gutters, sidewalk panels, valley gutters, concrete streets, and alley pavement.
  • 2024 Citywide Concrete Panel Replacement
    Panel replacement and remediation throughout the city where concrete failures have occurred. Curb ramps, curbs and gutters will be replaced as necessary.
  • 2024 Hot-in-Place Recycling and Repaving
    Treat approximately 72 lane miles of local, collector and arterial streets with hot-in-place recycling surface treatment. The process will occur at selected locations throughout the City.
  • 2024 Citywide Concrete Spot Repair
    Spot repairs to concrete curbs, gutters, sidewalk, cross pans, street panels, and alley panels
  • 2024 Citywide ADA Ramp & Concrete Repair B
    Work will include the removal and replacement of deficient concrete curbs, gutters, sidewalk panels, valley gutters, concrete streets, and alley pavement.
  • 2024 Street Maintenance Contract Mill & Overlay
    Roto-mill and asphalt overlay in various locations throughout the City and County of Denver. Approximately 30 lane miles of local, collector and arterial streets.
  • 2024 Chip Seal and Crack Seal
    Chip seal and crack seal work will be performed in various locations throughout the City and County of Denver.

Q2 2024

  • Denver Fire Station 40
    Improve fire service coverage and response times in Northeast Denver.
  • HSIP CCD 2018 Pkg 5: Colfax at Broadway/Lincoln/Grant
    HSIP CCD 2018 Pkg 5: Colfax at Broadway/Lincoln/Grant
  • E. 16th Avenue System, Phase 2
    90" diameter storm system that will be constructed east of City Park.
  • Globeville Levee Phase 2
    Improve the existing Globeville Levee along the west bank of the South Platte River.
  • HSIP CCD 2018 Pkg 4: Park @ I-25/I-70; Miss @ Platte/Santa Fe; Colfax/Downing
    Reconstruction of 4 existing traffic signals.
  • Bowles Ditch Separation, Phase 2
    This project is a general storm project to address drainage issues in southwest Denver.
  • General Storm - Torreys Peak
    This project is Phase 2 of Ellsworth Ave (Gray's Peak included Phase 1 work) storm drain. It consists of approximately 1,000 LF of open cut storm pipe construction.
  • Mill 22: Evans at Logan; Pearl; Franklin; Marion/Lafayette (MB)
    Upgrade 4 existing traffic signals and install one new warranted signal.

Q3 2024

  • 2019 - Castro Revitalization Project
    Professional design services for the renovation of DHS - Castro building located at 1200 Federal Boulevard. The facility is ~300,000SF on (4) floors including a partial basement.
  • Colfax Transit Implementation - Bus Rapid Transit
    Consultant services to assist in the completion of the NEPA and Preliminary Design tasks to prepare and advance the East Colfax Bus Rapid Transit (BRT)
  • Mill 20: South Monaco St Parkway
    Upgrade existing traffic signals
  • Mill Levy 26
    Reconstruction of 6 traffic signals.
  • Federal Boulevard and Amherst Avenue - HAWK Signal
    Safety-related improvements, including signal work, at the intersection of Federal Blvd and Amherst St.
  • MHFD CIP-Weir Gulch Reach 1
    Weir Gulch channel improvements between Decatur and 8th Ave.

Q4 2024

  • Evans Avenue Vision Zero Safety Project
    Evans Avenue Vision Zero Safety Project

Q1 2025

  • 48th Avenue Greenway - Phase 1
    Storm System Design along 48th Avenue in Globeville

Q2 2025

  • Yale Avenue Improvements
    Intersection and capacity improvements, sidewalk improvements, new traffic signals, on-street bike lane improvements
  • High Line Canal Connections
    This project will improve safety for trail users along the High Line Canal Trail, supporting bicycle and pedestrian activity and connectivity, both locally and regionally
  • Sanitary Lift Station #5
    Rebuild of sanitary lift station #5 in north Denver

 

On-Call Contracts

These opportunities are open only to those firms currently holding an on-call contract with DOTI.

Professional Services (Projected)

Q1 2024

  • Park Improvements - Elyria BB Court
    Elyria BB (f)
  • Park Improvements - Washington Picnic Sites 1&2 and Walks
    Park Improvements

Q2 2024

  • CCB Exhaust Fan 10 Access
    CCB Exhaust Fan 10 Access
  • Park Improvements - Boyd Walks
    Boyd Walks
  • Park Improvements - Ferguson Playground
    Replace aging Playground

Construction Services (Projected)

Q1 2024

  • 2022 - FIT - DCJ Bldg 22 Shower Design
    Produce CDs for the remodeling of approx. 32 showers at the DCJ
  • 405 S. Platte and Animal Shelter Power Upgrades
    405 S. Platte and Animal Shelter Power Upgrades
  • DCJ Switchgear Full Replacement FIT 2023
    DCJ Bldg 1: Replace all Switchgear
  • 2020 - Park Avenue Evidence Relocation
    Renovation of Park Avenue facility for evidence storage
  • 2022 - OMPD - Phase 2
    2022 OMPD entire building design
  • 2023 FIT Combined Communications Center - Replacement of second UPS
    Combined Communications Center - Replacement of second UPS
  • 2023 FIT Denver Municipal Animal Shelter - Electrical and ATS install
    Denver Municipal Animal Shelter - Electrical and ATS install
  • 2023 FIT LFC - Courtroom Access Control
    Courtroom access control. Review current access control in the facility and to begin discussion of how best to incorporate additional controllers and the 5th floor courtroom doors into the access control system.
  • 2023 FIT Police District 2 - Air cooled chiller retrofit
    Air cooled chiller retrofit
  • 2023 Kennedy Bridge D-01-CC-370
    Condition assessment, development of rehabilitation plan, and construction support services for Kennedy Golf Course Bridge D-01-CC-370
  • CPC Fleet Security Improvements & Site Lighting, Osage & Cherry Creek Site Safety Improvements
    Central Platte Campus: Exterior LED lighting upgrade, entry & exit gate repairs, Fleet Building #5 security system upgrades. 2021 S Osage: Back-in angled parking, new sidewalk and exterior LED lighting upgrades. 7301 S Jewell (Cherry Creek): Campus LED lighting upgrades
  • Bike Infrastructure Implementation - Community Networks: Central
    Bike Infrastructure Implementation - Community Networks: Central
  • N Williams St (E 21st to E 31st) Neighborhood Bikeway
    Installation of pavement markings, traffic circles, vertical elements, and bike lane signage along Williams St from E 21st Ave to E 31st Ave
  • E 26th Ave (Vine to Josephine) Protected Bike Lane
    Installation of pavement markings, traffic circles, vertical elements, and bike lane signage along E 26th Ave from N Vine St to N Josephine St
  • E 28th Ave (Downing to Vine) Protected Bike Lane
    Installation of pavement markings, traffic circles, vertical elements, and bike lane signage along E 28th Ave from Downing St to N Vine St. Installation of pavement markings, vertical elements, and bike lane signage along N Franklin St from E 28th Ave to E 29th Ave and E 29th Ave from N Franklin St to N Williams St.
  • E Virginia Ave/E Dakota Ave (Broadway to Marion St Pkwy) Neighborhood Bike Lane
    Installation of pavement markings, traffic circles, rectangular rapid flashing beacons, vertical elements, and bike lane signage along E Virginia Ave from S Broadway to S Sherman St and E Dakota Ave from S Sherman St to S Marion Parkway. The work also includes some signal adjustments along the corridor.
  • Traffic Signal - Harvard Gulch and University
    Traffic Signal - Harvard Gulch and University
  • Community Park Playground Replacements - Dailey Park
    Community Park Playground Replacements - Dailey Park
  • Field & Court Replacements - Dailey Park (Basketball Court)
    Field & Court Replacements - Dailey Park (Basketball Court)
  • Field & Court Replacements - Rosamond Park (Tennis Court)
    Renovating four post-tensioned tennis courts with improved lighting)
  • McNichols Building Water Leak
    Investigate and repair leak in Xcel vault lid at McNichols Building
  • Coliseum Backstage Restroom Renovation/ADA Improvements
    Coliseum Backstage Restroom Renovation/ADA Improvements
  • Eugene Field Branch Library Renovation
    A renovated and upgraded Eugene Field Branch Library with better amenities to more adequately suit the needs of the community.
  • Ross-Broadway Branch Library Renovation
    Expand and renovate the Ross-Broadway Branch Library to better serve the community while maintaining the historic character of the building.
  • Hampden Corridor Multimodal Improvements Phase 2
    Hampden Corridor Multimodal Improvements Phase 2 Project
  • 2022 - CCC - Camp Phase 3
    Mess Hall and Barracks 1a & 1b Restoration at Morrison
  • Bridge - Quebec Street Over Airlawn Road
    Quebec Street over Airlawn Road
  • Ross-University Hills Branch Library Renovation
    Renovate and update Ross-University Hills Branch Library to better serve the needs of the community.
  • 2022 Arts Complex - Galleria Restaurant (Olive & Finch)
    The purpose of this project is to assist DAV through design of a new restaurant at the existing backstage coffee
  • 2020 - Martinez Park - Phase 1 Design
    Project planned in 4 phases. Design estimate phase 1A $650k

Q2 2024

  • 2022 - CCB NW Cherokee St. Exit Ramp
    Make the existing northwest Cherokee St. facing east from the CCB an ADA accessible egress point for staff. Assuming the installation of a concrete ramp and railings and the removal of some existing granite stairs.
  • Bronco Bridge, 19th Ave Bridge, Guardrail Repair & Franklin St. Bridge Rehab Design Project
    Concrete deck sealing, expansion joint gland replacement, miscellaneous concrete flatwork, HMA mill and overlay, painting system, detailed inspection of bridges, etc.
  • 2021 - Council Chambers - Remodel
    Rebuild dais in Council chambers to accommodate new technology and ADA access
  • La Alma Lincoln Park Neighborhood Mobility Improvements
    La Alma Lincoln Park Neighborhood Mobility Improvements
  • Peoria Multimodal Improvements (Phase 2)
    Peoria Multimodal Improvements (Phase 2)
  • Mill 18 - 2018 Rebuild and Maintenance - Umatilla & 15th Street
    Mill 18 - 2018 Rebuild and Maintenance - Umatilla & 15th Street
  • Sloan's Lake Boat House Renovation
    Sloan's Lake Boat House Renovation
  • RR Loading Dock Design
    Extend/lengthen existing loading dock to accommodate larger trucks and create break/rest area below dock
  • Quebec 13th to 26th Multimodal Improvements
    Construct ADA compliant sidewalks, bus stops on Quebec 12th Ave to Montview and signal replacement at 17th and Quebec

Q3 2024

  • DFD Station 1 EV Charging Stations
    Install 15-16 dual port charging stations at parking spaces at the Fire HQ at 745 W Colfax Ave.
  • Park Improvements - Ciancio Walks
    Ciancio Walks
  • Park Improvements - Elyria BB Court
    Elyria BB (f)
  • Orphan Asset Guard Rail Repair: Quebec and Airlawn
    This project is for designing guardrails that need to be replaced on Quebec from I-70 to 35th Avenue
  • Park Improvements - Washington Picnic Sites 1&2 & Walks
    Washington Picnic Sites 1&2
  • 17th and 18th Avenue Bus Priority
    Develop recommendations for bus priority and Vision Zero treatments on 17th and 18th Avenues between Broadway and Colorado Blvd, followed by detailed final design of those recommendations

Q4 2024

  • 2022 - Overland Golf Course - Mechanical Upgrades
    Upgrade the existing HVAC system
  • Park Improvements - Boyd Walks
    Boyd Walks
  • Park Improvements - Ferguson Playground
    Replace aging Playground
  • LFC Fall Protection
    When working on LFC west elevation entrance canopy (Fox St. side). The canopy over the west elevation entrance is sloped toward the building, with leaves and dirt to collect in the internal gutter located against the building, and the gutter must be cleaned regularly. An appropriate means of fall protection was not originally provided.

Q1 2025

  • 2021 - Kennedy and Evergreen Golf Course - Restrooms Design
    The purpose of this project is to provide design and construction services for the addition of three restrooms at Kennedy Golf Course, and the replacement of one restroom at Evergreen Golf Course.
  • CCB Exhaust Fan 10 Access
    The project is to install a structural platform out over some existing steel beams
  • Capitol Hill/Civic Center NTMP Project Package
    Construct NTMP projects resulting from in-house NTMP-lite in the Capitol Hill and Civic Center neighborhoods