ADMIN 120A(PDF, 225KB) |
Classification of Licenses, Registrations and Certificates |
12/17/20 |
ADMIN 120B(PDF, 17KB) |
Modular Cold Storage Room Contractors |
10/17/11 |
ADMIN 126.4(PDF, 222KB) |
Demolition or Building Moving Permits |
6/09/17 |
ADMIN 130(PDF, 148KB) |
Residential (Single-Family and Duplex) Submittals |
3/1/16 |
ADMIN 130, 131, & IBC 3307(PDF, 456KB) |
Residential Excavation and Shoring |
11/12/21 |
ADMIN 130.2B(PDF, 517KB) |
Third Party Roofing Inspections |
1/24/17 |
ADMIN 131(PDF, 220KB) |
Permit Application and Issuance |
12/29/17 |
ADMIN 131B(PDF, 709KB) |
Alternative Permitting for Expedited Construction |
2/8/21 |
ADMIN 131.3(PDF, 261KB) |
Owner Occupier (Homeowner) Permits |
2/7/17 |
ADMIN 131.5(PDF, 333KB) |
Plan Review and Permit Cancellation |
3/9/21 |
ADMIN 132.9(PDF, 212KB) |
Compliance Plan and Conditional Certificate of Occupancy |
7/21/17 |
ADMIN 132A(PDF, 21KB) |
Groundwater Remediation Equipment Shelters |
3/21/16 |
ADMIN 132B(PDF, 20KB) |
Temporary Outdoor Stages |
3/21/16 |
ADMIN 133(PDF, 22KB) |
Electrical Plan Review Requirements |
4/11/16 |
ADMIN 133.3(PDF, 196KB) |
Setback Verification |
1/25/18 |
ADMIN 133.5, 135 and 136(PDF, 61KB) |
Foundation Only, Phased Construction and Deferred Submittal Permits |
10/11/16 |
ADMIN 134(PDF, 126KB)
|
Building Permit Application Requirements for Temporary Buildings |
9/5/18 |
ADMIN 134B(PDF, 818KB)
|
Temporary Sales Office Within a Model Home |
10/2/19 |
ADMIN 138(PDF, 202KB) |
Permit and Inspection Fees |
3/19/21 |
ADMIN 140.4(PDF, 98KB) |
Home Inspections Containing Weyerhaeuser Flak Jacket TJI Joists |
10/4/17 |
ADMIN 142A(PDF, 24KB) |
Temporary Occupancies |
3/21/16 |
ADMIN 603.1(PDF, 109KB) |
Limited Combustible Pedestals on Roofs of Type I and II Buildings |
9/17/20 |
IBC 302.1(PDF, 110KB) |
Occupancy Classification for Marijuana Uses |
8/22/20 |
IBC 310.3(PDF, 227KB) |
Residential and Personal Care, Assisted Living |
10/14/11 |
IBC 709.9(PDF, 18KB) |
Gas Fired Heating in R-1 and R-2 |
10/14/11 |
IBC 1008.1.9(PDF, 34KB) |
Locking and Securing of Egress Doors |
10/14/11 |
IBC 1014.3(PDF, 17KB) |
Tenant Finish of Existing Office Buildings |
10/14/11 |
IBC 1507(PDF, 18KB) |
Porch, Patio and Group U Roofing |
10/14/11 |
IBC 1704(PDF, 42KB) |
Special Inspector Qualification |
10/17/11 |
IBC 1705(PDF, 342KB) |
High-rise Building Exterior Wall Special Inspection Requirements |
2/14/19 |
IBC 3103(PDF, 18KB) |
Temporary Fabric Structures - Tents, canopies and Air Inflated Structures |
10/17/11 |
IBC 3303(PDF, 222KB) |
Demolition or Building Moving Permits |
6/09/17 |
IBC 3307.1.1(PDF, 126KB) |
Notification Prior to Excavation, Demolition or Relocation |
9/9/13 |
IBC 3408B(PDF, 26KB) |
Change in Occupancy or Use - Procedures for Obtaining a New Certificate of Occupancy |
10/14/11 |
IBC H106(PDF, 18KB) |
Permitting Procedures for Electric and Neon Signs |
10/17/11 |
IECC R101, R103 and IRC Chapter 11(PDF, 403KB) |
Submittal Requirements to Document Compliance with the IECC's Residential Provisions |
11/7/17 |
IECC C101, C103, C202, C408(PDF, 1MB) |
Submittal Requirements to Document Compliance with the IECC's Commercial Provisions |
2/13/19 |
IECC C202(PDF, 1MB) |
Approved Agency Determination RE: System Commissioning |
2/13/19 |
IECC C405(PDF, 17KB) |
Lighting and Metering Requirements |
4/11/16 |
IECC C408.2.4(PDF, 1MB) |
Commissioning Compliance Checklist |
9/11/18 |
IMC 301.4(PDF, 18KB) |
Waste Oil Heaters |
10/17/11 |
IMC 506, 507, 508(PDF, 150KB) |
IMC Kitchen Hood Exhaust System Submittal Requirements |
11/21/16 |
IMC 507(PDF, 112KB) |
Kitchen Hoods and Ventilation Requirements |
12/21/16 |
IPC Chapters 13 and 14(PDF, 374KB) |
Graywater Treatment Works Systems |
3/20/18 |
IRC 101, 202, 302.3, 311(PDF, 310KB) |
Residential Structures Containing a Second Complete and Independent Dwelling Unit |
11/16/18 |
IRC 401.4(PDF, 109KB) |
IRC Geotechnical Investigation Reports |
12/28/20 |
IRC 405.1(PDF, 18KB) |
Subsoil Drainage Systems |
10/17/11 |
IRC N1105 & N1106 & IECC 405 & 406(PDF, 120KB) |
Energy Rating Program Procedures |
11/7/17 |
IRC R302.1(PDF, 808KB) |
Exterior Wall Requirements for IRC Buildings |
1/16/18 |
IRC R302.2(PDF, 768KB) |
Extending Stories in IRC Townhouses |
1/16/18 |
NEC 590(PDF, 64KB) |
NEC 590 Temporary Power |
7/29/14 |
NEC 590.4(PDF, 36KB) |
Cable installation for temporary special events
|
5/6/15 |
NEC 705(PDF, 21KB) |
Distributed Resources Generating Systems |
10/17/11 |