Updated process: Upload documents for inspector review directly to construction and trade permits as attachments in E-permits. By uploading documents in E-permits, a Document Review inspection is automatically scheduled for the next business day.
Only use the form below if instructed to by your inspector. When using this form, you must schedule a “109 Other Inspection” in order to have your documents processed. When scheduling your inspection, include a comment with the document type(s) you uploaded (e.g., PE letter, energy report, UFER, etc.).
Click here to view form.
Documents accepted:
Please do not upload any plans, documents, or reports that need to be reviewed by plan review staff. Staff will not receive any items uploaded here.
Do not upload As-Built Setback Certification forms. Please have your setback and bulk plane forms on-site with your permit for the inspector.