Where: Northeast corner of Lincoln and Ohio
- Sidewalk, curb and gutter work has begun along the east side of Lincoln, and along Ohio between Lincoln and Sherman
- Impacts:
- Closures of the east sidewalk on Lincoln, from Ohio to Walsh, and north sidewalk on Ohio from the alleyway to Lincoln, on the northeast corner of Lincoln and Ohio began in late March, lasting through early June 2025.
- The alleyway between Lincoln and Sherman has reopened to vehicular traffic.
- Please see the current pedestrian access map linked here for details.
Where: Southbound I-25 on-ramp at Broadway
- What: Elevated on-ramp to SB I-25 opened December 20, 2024
- Additional access to SB I-25 via Mississippi Avenue or Alameda and Kalamath. See Access Map here.
Where: Southbound I-25 off-ramp at Broadway (Exit 207A)
- What: Left lane closure
- When: Began March 27 and will last through late September 2025
Where: Bannock between Exposition and the RTD Station
- While crews continue work on the future Denver Tramway Trolley Line interpretive mitigation area, please expect the following impacts:
- Sidewalk on east side of Bannock between Exposition and RTD lot is closed. This closure is expected to last through late April.
- Please use pedestrian crosswalks at Kentucky to access the RTD station.
- No vehicle access from temporary RTD parking lot to Bannock.
- Please use Broadway and Kentucky to access the RTD station.
Where: Ohio Avenue between Broadway and Lincoln Avenue
- What: Closed to through traffic
- When: Began Monday, July 1, lasting through 2025
Where: Sidewalk along the east and west sides of Broadway between Kentucky and Ohio avenues
- East sidewalk between Kentucky and Ohio Avenue reopened on Feb. 17, 2025
- Sidewalk closure along west side of Broadway between Kentucky and Exposition avenues began July 26, 2024, lasting through 2025.
Where: Northbound and southbound Broadway between Mississippi and Center avenues
- The number of travel lanes on Broadway within the project limits has been reduced to two lanes in each direction and will remain this way through the summer of 2025
Broadway Station Access Pedestrian Detour
For your safety, please do not travel through the active construction site.
- To access RTD Broadway Station, follow west Kentucky
Please note that there will be variable traffic patterns along Broadway for the duration of this project. All lane closures will be communicated in advance.
All project activities are weather- and site-condition-dependent, and schedules are subject to change.