Welcome to Work4Denver

On this site you will find information for bidding on upcoming construction projects, service opportunities, submit requests for proposals and qualifications, and access to valuable information to keep you informed of the procedures and processes for a successful bidding experience.  

Below is a list of current opportunities! 

Current Bidding Opportunities

May 06, 2015 (13 reads)
This project reconstructs South Broadway from Arizona Avenue to Kentucky Avenue in concrete, ranging from a four to eight lane section with turn lanes.  A center median, and “bulbouts" or "curb extensions" are to be constructed near intersections. The existing span wire traffic signal are to be replaced by new mast arm traffic signals at  Mississippi and Tennessee. Street lighting, pedestrian lighting, streetscaping, landscaping and irrigation is included.  A 10 ft concrete multi-use sidewalk is to be placed on the east side of Broadway.  Other concrete sidewalks within the project limits are a minimum of 8 feet wide.  The existing 12 inch waterline and storm sewer facilities will be replaced.  Mississippi is to be reconstructed to provide additional turn lanes.  Mississippi is to be reconstructed in asphalt outside of the intersection with Broadway.  The work includes the relocation of a portion of the 30 inch water conduit, and the reconstruction of the northern retaining wall.
May 05, 2015 (54 reads)

The major item of work to be completed under this project is the rehabilitation of approximately 78,742 lineal feet of sanitary sewer mains with structural deterioration problems citywide, using Wastewater Division approved cured-in-place pipe method of construction.

Apr 28, 2015 (218 reads)

This project, federally funded, is to improve the drainage conditions in the Basins 0062-01 & 4500-02 (approximate areas between S. Platte River to East 13th Ave. and from North William Street to North Grant Street) during a 5 year storm event. The first phase of this project is to construct the storm sewer system and its associated facilities from Arkins Court to Mountain Cement along the projected 33rd Street.

201521811 - Broadway & 16th Avenue Intersection Improvements  Apr 28, 2015 (235 reads)
201521883 - 35th/36th and Blake Pedestrian Bridge  Apr 24, 2015 (270 reads)
RFP East Colfax Avenue Enhanced Transit Corridor (Parsons)  Apr 23, 2015 (216 reads)
RFQ for Construction Management/General Contractor Services for McNichols Redevelopment Ph. 2  Apr 09, 2015 (415 reads)

Page 1 2


Feedback