Streets, Transportation, and Public Works Projects

The Better Denver Bond Program continues to enhance the City’s ability to perform regular upkeep of critical transportation infrastructure. Public Works has identified key areas for improvement that will increase options for pedestrian mobility, reduce traffic congestion, enhance neighborhood streetscapes, and generally encourage long-term socio-economic development for our residents and businesses. Ballot measure 1D is funding over $149.7 million in improvements to streets, transportation and public works projects throughout the City.

 

Ongoing Projects

Roadway reconstruction and streetscape improvements.

Streetscape improvements including design and construction of a pedestrian bridge spanning 38th Avenue.

Provision of basic infrastructure for future transit oriented development, including design and construction of a pedestrian bridge spanning railroad tracks.

Maintenance or reconstruction of the following roadways:

  • 13th Avenue (Colorado Blvd to York St)
  • Broadway (Welton St to Park Avenue)
  • DTC (I-225 to Belleview Ave)
  • Holly (Cherry Creek Dr to Evans Ave)
  • Tennyson Street (26th Ave to 32nd Ave)
  • University Blvd (Buchtel Blvd to Asbury St)
  • Yale Ave (Federal Blvd to Tennyson St)
  • York & Josephine (Colfax Ave to 18th St)
  • Broadway (Asbury St to Wesley St)
  • Broadway (Iowa St to Asbury St)
  • Evans (Broadway St to Bannock St)
  • 3rd Ave (Steele St to Colorado Blvd)
  • Irving St (W 17th Ave to W 32nd Ave)
  • Irving St (W Mississippi Ave to W Florida Ave)
  • Evans Ave (S Holly St to S Quebec St)
  • 13th Ave (Kalamath St to Osage St)
  • E 8th Ave (Downing St to York St)
  • Quincy Ave (S Wadsworth to County Boundary)
  • Steele St (39th Ave to I-70)
  • Park Avenue West (Colfax Ave to Welton St)
  • E 11th Ave (Monaco Pkwy to Yosemite St)
  • E 1st Ave (Corona St to University Blvd)
  • Clarkson St (E 8th Ave to E 20th Ave)
  • Kalamath St (48th Ave to 52nd Ave)
  • Perry St (Ellsworth Ave to 6th Ave)
  • 8th Ave (Zuni St to Federal Blvd)
  • E Iowa Ave (S Logan St to S Lafayette St)
  • Stapleton Industrial Neighborhood
  • University Blvd/Josephine St (1st Ave to 6th Ave)
  • 1st Ave (Federal Blvd to Irving St)
  • 31st Ave (N Williams St to N York St)
  • 46th Ave (N Jason St to N Pecos St)
  • Martin Luther King Blvd (Colorado Blvd to Quebec St)
  • 15th St (Platte River Dr to Boulder St)
  • Larimer St (15th St to 17th St)
  • East 1st Ave (Westbound)
  • Washington St (Virginia Ave to Buchtel Blvd)
  • Emerson St (Virginia Ave to Buchtel Blvd)
  • Yale Ave (Tennyson St to Sheridan Blvd)
  • Morrison Road (Alameda Blvd to Stuart St)
  • Colfax Ave (Sheridan Blvd to Federal Blvd)
  • Broadway (Arizona St to Iowa St)
  • Broadway (Yale Ave to Wesley St)
  • 14th Street (Market St to Colfax Ave)
  • 29th Avenue and Central Park Blvd Intersection
  • Cherry Creek Drive South (Alameda to Steele)

Roadway reconstruction and streetscape improvements.

Completed Projects

Procurement and installation of a prefab office annex, expansion of the existing truck transfer facility, and related improvements.

Reconfiguration/maintenance of roadway and multi-modal transportation updates.

Roadway reconstruction and streetscape improvements.

Roadway reconstruction and streetscape improvements.

Improvements to sidewalks/curb ramps between neighborhoods and transit station, as well as installation of HALO security cameras, communications infrastructure and pedestrian lighting.

Improvements to sidewalks/curb ramps between neighborhoods and transit station.

Improvements to sidewalks/curb ramps between neighborhoods and transit station.

Improvements to sidewalks/curb ramps between neighborhoods and transit station.

Repair of concrete sound wall between E Kenyon and E Oxford.

Widening of lanes, new northbound lane, new median/curb/gutter.

Design and construction of new highway interchange.

Roadway reconstruction including re-grading for improved sight distance.

Improvements to sidewalks/curb ramps between neighborhoods and nearby transit stations.

Improvements to sidewalks/curb ramps.

Design and construction of grade separation for future RTD A Line.

 

Project Reports

Each report includes scope, cost, schedule and project team information.