Skip navigation

2015 Archive

Results 21 - 21 of 21

Feb 17, 2015

201520345 Inca Street Multi-Use Path 38th Ave to 43rd Ave.

Construction of the Inca street multi-use path from 38th Avenue to 43rd Avenue to include curb and gutter, a 12 foot wide sidewalk   on the east side of Inca Street, and roadway as required.  Other elements to support the multi-use path include retaining walls to  match existing grade on the east and new drainage structures and multi-use path lighting.  38th Avenue Underpass elements will include patching of underpass walls, painting/coating of underpass walls, repair and/or replacement of railings, and repair/replacement of underpass lighting.