Skip navigation

Contract No. 201525095 Kennedy Ballpark Detention Pond

This project is located near Kennedy Ball Fields and Kennedy Golf Course in southeast Denver. This project will mitigate flooding by constructing an outfall pipeline system to redirect flood waters from the existing detention basin to Cherry Creek during a 100-year storm event. Construction items include: Open cut installation of the 72" RCP's; large manholes, large inlet/outlet structures and its appurtenances; grouted boulders at Cherry Creek; removal and restoration of Kennedy Golf Course improvements including landscaping, tee boxes, sand trap, sprinkler systems, golf cart paths; removal and replacement of a regional bike/pedestrian trail; removal and disposal of the flood control earthen berm.

Statement of Quantities

Addendum 1

Addendum 2

Addendum 3

 

Pre-Bid Roster

Estimated Construction Cost

$2,694,080.00 - $3,292,764.00

Pre Bid on 11/13/15 at 10:00 AM 

3rd Floor Conference Room 
2000 W. 3rd Ave.
Denver, CO 80223

Updated: Bid Opening on 12/17/15 at 11:00 AM

6th Floor Conference Room – 6.G.7
201 W. Colfax Ave.
Denver, CO 80202

Plans Available November 5, 2015

Digital Download

Quest Project # 4154180
Plan Cost $10.00

Contract Administrator: Toni Green
Toni.green@denvergov.org  

M/WBE goal: 7.00%

FOR COMPLETE DESCRIPTION SEE AD IN The Daily Journal ON THE FOLLOWING DATES:

Thursday, November 5, 2015
Friday, November 6, 2015
Monday, November 9, 2015

PREQUALIFICATION: 

  • 1E(4) PIPED SEWER in the $3M monetary level