Contract No. 201523858 South Broadway Reconstruction, Arizona Avenue to Kentucky Avenue

This project reconstructs South Broadway from Arizona Avenue to Kentucky Avenue in concrete. The width of the roadway ranges from a four to eight lane section with turn lanes.  A center median, and “bulbouts" or "curb extensions" are to be constructed near intersections. The existing span wire traffic signals are to be replaced by new mast arm traffic signals at  Mississippi and Tennessee. Street lighting, pedestrian lighting, streetscaping, landscaping and irrigation is included. A 10 ft concrete multi-use sidewalk is to be placed on the east side of Broadway.  Other concrete sidewalks within the project limits are a minimum of 8 feet wide. The existing 12 inch waterline and storm sewer facilities will be replaced. Mississippi is to be reconstructed to provide additional turn lanes.  Mississippi is to be reconstructed in asphalt outside of the intersection with Broadway. The work on Mississippi includes the relocation of a portion of the 30 inch water conduit, and the reconstruction of the northern retaining wall. 

Statement of Quantities

Pre-Bid Sign In Sheet

Addendum 1

Addendum 2

Bid Summary

Estimated Construction Cost

$10,400,000.00 and $11,200,000.00

Prebid on 09/01/2015 at 9:00 AM

Room 4.I.5.

201 W. Colfax Ave.

Denver, CO 80202

Bid Opening on 10/01/15 at 11:00 AM

Room 6.G.7

201 W. Colfax Ave.

Denver, CO 80202

 

Plans Available August 24, 2015:

Digital Download

Quest Project #4069378 

Plan Cost $10

http://qap.questcdn.com/qap/projects/prj_browse/ipp_prj_browse.html?group=842700&provider=842700

Contract Administrator:

Shannon Dyer

Phone:  (720) 913-8531 

DBE goal:    10.00%

 

FOR COMPLETE DESCRIPTION SEE AD IN The Daily Journal ON THE FOLLOWING DATES:

Monday, August 24, 2015

Tuesday, August 25,2015

Wednesday, August 26,2015

THE FOLLOWING PREQUALIFICATIONS ARE REQUIRED

1A General or 1F(2) Concrete at the $12 million monetary level