Contract 201841827 27th Street Storm Interceptor — Phase 1

General Statement of Work: The 27th Street Interceptor Project will improve drainage conditions in Basin 0062-1 by utilizing an existing 108" diameter storm system approximately 200' west of the 27th St. and Blake St. intersection in the Coors Field Parking lot. Phase 1 extends from the 108" southeast to 27th and Arapahoe. Construction includes open cut and tunneling of large diameter storm sewer and its associated facilities as well as construction of a large storm water quality vault. 

Estimated Construction Cost:  Between $6,700,000.00 and $7,400,000.00

Statement of Quantities (PDF)

Addendum #1 (PDF)

Addendum #2 (PDF - 16MB)

Addendum #3 (PDF)

Addendum #4 (PDF)

Addendum #5 (PDF)

 

Pre-Bid Conference: June 5, 2018 at 9:00 a.m. local time

Webb Building
201 W. Colfax Ave., 4th floor
Room 4.F.6
Denver, CO 80202

Sign-in Sheet (PDF)

Questions Deadline: June 28, 2018 at 2:00 local time

Bid Opening Date: July 12, 2018 July 19, 2018 at 11:00 a.m.

Webb Building
201 W. Colfax Ave., 6th floor
Room 6.G.7
Denver, CO 80202

Plans Available May 7, 2018:

Digital Download

QuestCDN Project #5735961
Plan Cost $10.00

Contract Administrator: David Relaford
david.relaford@denvergov.org

M/WBE goal: 15%

FOR COMPLETE DESCRIPTION SEE AD IN The Daily Journal ON THE FOLLOWING DATES:
May 8, 9, 10, 2018

The following prequalification category is required:
Each bidder must be prequalified as a 1E (4) – Piped Sewer in the $9,000,000.00, monetary level in accordance with the City’s Rules and Regulations Governing Prequalification of Contractors.  Each bidder must have submitted a prequalification application a minimum of ten (10) calendar days prior to the bid opening date. To view the Rules and Regulations and to obtain a prequalification application, please visit our website at www.denvergov.org/prequalification or call 720-865-2539 for prequalification information ONLY.