Contract 201844069 Red Rocks Subsurface Stabilization and Drainage

General Statement of Work: The project includes the demolition and reconstruction of seats 1-20 in rows 1-18 of the amphitheatre. This will include new micro piles under the reconstructed seating areas to provide stabilization. The project also includes rebuilding the north and pulpit plaza gutters as well as installing new retaining walls and vegetation in those areas. Repairs to the South stair and row 69 are included. New stone facade will also be placed on the existing retaining walls down to the Visitor's Center driveway.

Estimated Construction Cost
Between $2,726,000 and $3,331,000

Addendum #1 (PDF - 107MB)

Addendum #2 (PDF)

Prebid on September 6, 2018 at 2:00 p.m.

Room 4.I.5
201 W. Colfax Ave.
Denver, CO 80202

Sign-in Sheet (PDF)

Special Instructions: This construction project will occur during the 2018/2019 winter and is located in the foothills of Morrison. The project shall be substantially complete by April 1, 2019. This includes all seating work, the south stair repairs and row 69 repairs. April 19, 2019 tentatively marks the beginning of the summer concert season and will require that all seating and stairways be open on this date. The north gutter, pulpit plaza gutter and stone façade along the Visitor's Center drive will need to be complete or cleaned up after each working day for concerts if not completed by this date. Damages will be assessed at the start of the concert season if any seats or stairs are not available for use at that time.

Although this project will have one construction contract, it has two design packages. In order to avoid confusion, this project will include separate submittals/RFIs/OACs for each design package. OAC's can occur back-to-back on the same day each week since the same Owner and Contractor teams will be attending both.

Question Deadline on September 14, 2018 at 2:00 p.m.

Bid Opening on September 27, 2018 October 4, 2018 at 11:00 a.m.

Room 6.G.7
201 W. Colfax Ave.
Denver, CO 80202

Plans Available August 29, 2018:

Digital Download

Quest Project #5925320
Plan Cost $10

Contract Administrator:  Debby Gibson
Phone:    720 913 8528

Goal:     4% M/WBE

For complete description see Ad in The Daily Journal on the following dates:
August 29, 30, 31, 2018

The following prequalification category is required: 2A General Building OR 1G(2) Minor Structures in the $6,000,000 monetary level