Contract 201845550 Asbury & Tejon Park

General Statement of Work: Asbury & Tejon Park is a relatively small park comprised of two parcels near the intersection of West Asbury Avenue and South Tejon Street in the southwest portion of the City and County of Denver. The park is managed by DPR, but the park also plays a significant role in managing stormwater for the Ruby Hill Drainage Basin (basin 0065-01). The current stormwater infrastructure located within the park impacts both the function and aesthetics of the park from a recreational standpoint. This project entails the retrofit of the existing detention basin in Asbury & Tejon Park to include water quality and improve recreational aspects of Park.

Estimated Construction Cost: 
Between $2,044,000.00 and $2,500,000.00

Statement of Quantities (PDF)

Prebid Conference: December 17, 2018 at 9:00 a.m.

201 W. Colfax Ave.
4th floor, Room 4.I.4
Denver, CO 80202

Question Deadline on January 4, 2019, 11:00 a.m.

Bid Opening on January 17, 2019 at 11:00 a.m.

Room 6.G.7
201 W. Colfax Ave.
Denver, CO 80202

Plans Available December 5, 2018 :

Digital Download

Quest Project #6014587
Plan Cost $15

Contract Administrator:  David Relaford
Phone:  720 913 8531

M/WBE Goal:     10%

For complete description see Ad in The Daily Journal on the following dates:
December 5, 6, 7, 2018

The following prequalification category is required: 1E(5)SEWER – OPEN CHANNEL AND POND or 1E(4) - PIPED SEWER at or above the $3,000,000.00 monetary level