Contract 201845552 Federal AID Project No. SHE M320-116

General Statement of Work: This project will remove and replace existing traffic signal equipment at two intersections (York Street/7th Avenue and Josephine Street/7th Avenue). Civil improvements will aslo be constructed including upgrading curb ramps in all eight quadrants of both one-way couplet intersections and removal and replacement of sidewalk and curb and gutter as shown in the design plans.

Estimated Construction Cost: 
Between $1,085,000 and $1,326,000

Prebid on November 14, 2018 at 10:00 a.m.

Room 4.I.5
201 W. Colfax Ave.
Denver, CO 80202

Sign-in Sheet (PDF)

Question Deadline on November 21, 2018 at 2:00 p.m.

Bid Opening on December 6, 2018 at 11:00 a.m.

Room 6.G.7
201 W. Colfax Ave.
Denver, CO 80202

Plans Available November 7, 2018 :

Digital Download

Quest Project #6005249
Plan Cost $15

Contract Administrator:  Debby Gibson
Phone:  720 913 8528

Goal:     10% DBE

The following prequalification category is required: Each bidder must be prequalified as a 1D(1) Traffic Signals in the $1.5M monetary level in accordance with the City’s Rules and Regulations Governing Prequalification of Contractors. 