Skip navigation

Contract 201846018 La Plata Peak General Storm

General Statement of Work: The La Plata Peak General Storm contract has two separate project locations, one at 43rd Ave & Sherman St and the other at Exposition Ave & S Fillmore St. Each location will address localized flooding problems by constructing a new storm drain system that ties into existing storm drain infrastructure. Concrete flatwork such as curb, gutter, sidewalk and concrete crosspans and asphalt paving will also be part of the scope of work.

Estimated Construction Cost:
Between $3,200,000.00 and $3,600,000.00

Statement of Quantities (PDF)

Pre-bid on 12/12/2018 at 1:00 PM

Wastewater Building
2000 W 3rd Avenue
3rd Floor Conference Room    
Denver, CO 80223

Sign-in Sheet (PDF)

Questions Deadline: January 7, 2019 at 2:00 p.m. local time

Bid Opening on 1/17/2019 at 11:00 AM

Webb Building
201 W. Colfax Avenue
6th Floor Conference Room 6.G.7
Denver, CO 80202

Plans Available November 28, 2018

Digital Download

QuestCDN Project #6013598
Plan Cost    $15.00

M/WBE goal:  15%

Prequalification
1E(4) PIPED SEWER at or above the $6,000,000.00 level

Contract Administrator: Diane Mora
diane.mora@denvergov.org

FOR COMPLETE DESCRIPTION SEE AD IN The Daily Journal ON THE FOLLOWING DATES: 
Wednesday, November 28, 2018
Thursday, November 29, 2018
Friday, November 30, 2018