Skip navigation

2019 Archive

Results 1 - 10 of 46

Nov 19, 2019

Contract 201952606 Yale Station Pedestrian Safety

This project includes the installation of a new traffic signal at E Yale Ave and E Yale Circle, an approximately 95' long concrete median, rebuilt curb ramp (removal of existing and installation of realigned new), full-depth patching of asphalt pavement, milling of asphalt pavement, an overlay of asphalt paving, and associated signing and striping.

Nov 13, 2019

Contract 201952435 Marion Street System, Phase 1

This storm drainage project extending along Marion Street Corrior from MLK Blvd. to E. 27th Ave. (five city blocks) will connect the upstream end of the 33rd Street Outfall system at MLK Blvd. The majority of the work consists of open cut construction of 8' x 8' concrete boxes and relocation of a 6" waterline. Other areas of work include surface restoration in asphalt paving, in concrete sidewalks, and in curb ramps. Green infrastructure (Streetside Stormwater Planters) is also part of other areas of work to enhance water quality.

Oct 21, 2019

RFQ: 5280 Loop On 21st Street Design

* NEW DATE * The selected team will work under the guidance of the City and County of Denver (CCD) and Downtown Denver Partnership (DDP) staff to further analyze, evaluate and develop 30% design plans for creating an urban trail along 21st Street from Coors Field to Benedict Fountain Park. This project will build off the previous work of the 21st and Wynkoop Street Urban Design Plan (2016) and the 5280 Loop Concept Design Study (on-going) and will evaluate modifications to the street from a range of perspectives, including changes to multimodal access, drainage/utilities, adjacent land uses, etc. This effort will establish relationships between the multiple functions of the shared right-of-way, incorporating the wide range of design concepts envisioned for The 5280 Loop. A project milestone will occur after 30% design completion and an unknown portion of the corridor will be brought to 100% design with remaining funds.

Oct 11, 2019

RFQ: CM/GC Services Wastewater Building Improvements

The City and County of Denver (City) is soliciting Requests for Qualifications from qualified firms to provide Construction Management/General Contracting services to renovate the Wastewater Building located at 2000 W 3rd Ave, Denver, Colorado. The goal of the project is to perform an interior renovation of the building and required code, ADA and LEED improvements. The work is to occur in an occupied facility and could be a multi-phased project based on the availability and capacity of temporary swing space and budget. Should the City choose to continue to work with the selected firm through the construction phase, then a separate CM/GC agreement will be signed.

Oct 9, 2019

Contract 201952040 2019 Citywide Concrete Spot Repairs, Phase 2

Citywide concrete repairs to curb, gutter, sidewalk, valley gutter, concrete street and alley. Potential work locations are generated from on-going citizen complaints and are not scoped at the time of bidding.

Oct 7, 2019

Contract 201851838 35th St & Lincoln Park Sanitary Improvements

*** NEW BID OPENING DATE *** This is a Sanitary Sewer Project regarding deteriorated gravity drained sewer pipes, designed for use of Wastewater Management Division approved, Cured-In-Place-Plastic Pipe or Formed-In-Place Pipeliner Methods of Construction, which are methods of sewer pipe rehabilitation that are cost effective and consistently allow significantly shorter construction time in comparison to open trench method of construction. Since no excavation is required, utilities and traffic conflicts are minimized, thereby citizen discomfort and complaints are reduced to minimum. This Lining Project is located in 35th Street/Avenue.

Sep 30, 2019

Contract 201951912 Highline Canal Underpass at Hampden and Colorado

*** NEW BID OPENING DATE *** Installation of two pedestrian box culverts under each of Colorado Blvd. and Hampden Ave. in order to improve pedestrian and cyclist safety and improve trail connectivity. Work includes construction of new trail between the underpasses and a connection to the existing High Line Canal Trail to the north.

Sep 9, 2019

RFQ: 56th Avenue Widening - Peoria Blvd To Peña Blvd

The City and County of Denver is seeking a design engineering team for professional services necessary to provide basis of design and procurement documents necessary for the Design-Build contract for the widening of the 56th Ave. from Peoria Blvd to Peña Blvd. Services include, but are not limited to, preliminary roadway engineering, project management, preliminary geotechnical investigations, preliminary mixed-use path design, procurement document creation, and public involvement. Support services during construction may be added once the construction documents are complete.

Aug 28, 2019

Contract 201951453 Lindsey Flanigan Courthouse Courtroom Buildouts

*** NEW BID OPENING DATE *** The Lindsey Flanigan Courthouse (“the Courthouse”) Courtroom Buildouts will include the construction of new courtrooms, jury deliberation rooms with restrooms, judge’s chamber with restrooms, holding areas including cells, visitation rooms, and conference rooms all within existing shell spaces inside the Courthouse. These shell spaces include much of the infrastructure for mechanical, electrical, and plumbing systems. Limited demolition will be required as a result. Furniture, fixtures, and equipment (FF&E) composed of audio visual and network systems as well as furniture will also be included. Each courtroom will require custom millwork and acoustic wall treatments.

Aug 27, 2019

Contract 201951576 2019 Neighborhood Sidewalk Repairs, Phase 1

Contractor will go into neighborhood regions designated by the City and repair concrete or flagstone sidewalk that has been identified by City personnel as non-compliant with City codes. Repairs may include slab leveling, joint grinding or stone replacement. Landscape/irrigation system protection/replacement and traffic/pedestrian control are ancillary to the contract and will be paid for separately. It is estimated that 20% of this contract’s work will be performed Citywide and 80% in the sidewalk repair district.