Skip navigation

2019 Archive

Results 1 - 10 of 51

Dec 19, 2019

Contract 201952918 2020 Citywide ADA Ramp and Concrete Repair A

2020 Citywide ADA construction alongside repairs to the concrete curb, gutters, sidewalks, valley pans, concrete street panels and alley pavement.

Dec 19, 2019

Contract 201952932 2020 Citywide Concrete Panel Replacement

2020 panel replacement throughout the city where concrete failures have occurred. Curb ramps, curbs and gutters will be replaced as necessary.

Dec 18, 2019

Contract 201952601 High Line Canal Underpass at Parker Rd. and Mississippi Ave.

*** NEW BID OPENING DATE *** Construction of a bike/pedestrian box culvert underpass for the High Line Canal Trail crossing under Parker Rd and Mississippi Ave. for the City and County of Denver as the (Local Agency), and its partners, Arapahoe County and CDOT Region 1. The Local Agency project is located in the City and County of Denver (North) and Arapahoe County (South). The new underpass will significantly improve the safety and experience of the High Line Canal Trail for pedestrians and cyclists as well as creating a faster/safer pedestrian connection across Parker Road while enhancing traffic operations. The proposed box culvert is 14-ft wide, 10-ft tall, and ~245-ft long. Retaining walls will be constructed along the underpass approaches, between the trail and service road and on the south side of the trail.

Dec 18, 2019

Contract 201952912 2020 Citywide Bond Concrete Repair

Remove and replace damaged curb and gutter, curb, and out of compliance curb ramps on arterial/collector streets throughout Denver.

Nov 25, 2019

RFQ: Sanitary Sewer Master Plan

The City and County of Denver is seeking a qualified engineering consulting firm to create and implement a flow monitoring plan and build a calibrated hydraulic model for both wet and dry conditions. The project includes development of a modern Sanitary Sewer Master Plan and evaluation of existing conditions and planned future growth to recommend and prioritize improvements for the upcoming capital improvements plan.

Nov 19, 2019

Contract 201952606 Yale Station Pedestrian Safety

This project includes the installation of a new traffic signal at E Yale Ave and E Yale Circle, an approximately 95' long concrete median, rebuilt curb ramp (removal of existing and installation of realigned new), full-depth patching of asphalt pavement, milling of asphalt pavement, an overlay of asphalt paving, and associated signing and striping.

Nov 13, 2019

Contract 201952435 Marion Street System, Phase 1

*** NEW BID OPENING DATE *** This storm drainage project extending along Marion Street Corrior from MLK Blvd. to E. 27th Ave. (five city blocks) will connect the upstream end of the 33rd Street Outfall system at MLK Blvd. The majority of the work consists of open cut construction of 8' x 8' concrete boxes and relocation of a 6" waterline. Other areas of work include surface restoration in asphalt paving, in concrete sidewalks, and in curb ramps. Green infrastructure (Streetside Stormwater Planters) is also part of other areas of work to enhance water quality.

Oct 21, 2019

RFQ: 5280 Loop On 21st Street Design

* NEW DATE * The selected team will work under the guidance of the City and County of Denver (CCD) and Downtown Denver Partnership (DDP) staff to further analyze, evaluate and develop 30% design plans for creating an urban trail along 21st Street from Coors Field to Benedict Fountain Park. This project will build off the previous work of the 21st and Wynkoop Street Urban Design Plan (2016) and the 5280 Loop Concept Design Study (on-going) and will evaluate modifications to the street from a range of perspectives, including changes to multimodal access, drainage/utilities, adjacent land uses, etc. This effort will establish relationships between the multiple functions of the shared right-of-way, incorporating the wide range of design concepts envisioned for The 5280 Loop. A project milestone will occur after 30% design completion and an unknown portion of the corridor will be brought to 100% design with remaining funds.

Oct 11, 2019

RFQ: CM/GC Services Wastewater Building Improvements

The City and County of Denver (City) is soliciting Requests for Qualifications from qualified firms to provide Construction Management/General Contracting services to renovate the Wastewater Building located at 2000 W 3rd Ave, Denver, Colorado. The goal of the project is to perform an interior renovation of the building and required code, ADA and LEED improvements. The work is to occur in an occupied facility and could be a multi-phased project based on the availability and capacity of temporary swing space and budget. Should the City choose to continue to work with the selected firm through the construction phase, then a separate CM/GC agreement will be signed.

Oct 9, 2019

Contract 201952040 2019 Citywide Concrete Spot Repairs, Phase 2

Citywide concrete repairs to curb, gutter, sidewalk, valley gutter, concrete street and alley. Potential work locations are generated from on-going citizen complaints and are not scoped at the time of bidding.