Oct 7, 2019

Contract 201851838 35th St & Lincoln Park Sanitary Improvements

*** NEW BID OPENING DATE *** This is a Sanitary Sewer Project regarding deteriorated gravity drained sewer pipes, designed for use of Wastewater Management Division approved, Cured-In-Place-Plastic Pipe or Formed-In-Place Pipeliner Methods of Construction, which are methods of sewer pipe rehabilitation that are cost effective and consistently allow significantly shorter construction time in comparison to open trench method of construction. Since no excavation is required, utilities and traffic conflicts are minimized, thereby citizen discomfort and complaints are reduced to minimum. This Lining Project is located in 35th Street/Avenue.

Sep 30, 2019

Contract 201951912 Highline Canal Underpass at Hampden and Colorado

*** NEW BID OPENING DATE *** Installation of two pedestrian box culverts under each of Colorado Blvd. and Hampden Ave. in order to improve pedestrian and cyclist safety and improve trail connectivity. Work includes construction of new trail between the underpasses and a connection to the existing High Line Canal Trail to the north.

Sep 9, 2019

RFQ: 56th Avenue Widening - Peoria Blvd To Peña Blvd

The City and County of Denver is seeking a design engineering team for professional services necessary to provide basis of design and procurement documents necessary for the Design-Build contract for the widening of the 56th Ave. from Peoria Blvd to Peña Blvd. Services include, but are not limited to, preliminary roadway engineering, project management, preliminary geotechnical investigations, preliminary mixed-use path design, procurement document creation, and public involvement. Support services during construction may be added once the construction documents are complete.

Aug 28, 2019

Contract 201951453 Lindsey Flanigan Courthouse Courtroom Buildouts

*** NEW BID OPENING DATE *** The Lindsey Flanigan Courthouse (“the Courthouse”) Courtroom Buildouts will include the construction of new courtrooms, jury deliberation rooms with restrooms, judge’s chamber with restrooms, holding areas including cells, visitation rooms, and conference rooms all within existing shell spaces inside the Courthouse. These shell spaces include much of the infrastructure for mechanical, electrical, and plumbing systems. Limited demolition will be required as a result. Furniture, fixtures, and equipment (FF&E) composed of audio visual and network systems as well as furniture will also be included. Each courtroom will require custom millwork and acoustic wall treatments.

Aug 27, 2019

Contract 201951576 2019 Neighborhood Sidewalk Repairs, Phase 1

Contractor will go into neighborhood regions designated by the City and repair concrete or flagstone sidewalk that has been identified by City personnel as non-compliant with City codes. Repairs may include slab leveling, joint grinding or stone replacement. Landscape/irrigation system protection/replacement and traffic/pedestrian control are ancillary to the contract and will be paid for separately. It is estimated that 20% of this contract’s work will be performed Citywide and 80% in the sidewalk repair district.

Aug 13, 2019

Contract 201951223 Harvey Park Irrigation Renovations Phase II

This irrigation improvements project is necessitated by conversion of the existing potable water irrigation system to a new raw water system drawn from Harvey Park Lake and replenished by water from the Ward Reservoir #5.

Aug 7, 2019

Contract 201951264 56th Ave and Pena Blvd Interchange

* NEW BID OPENING DATE * This project includes earthwork, asphalt paving, concrete flatwork, drainage improvements, detention pond construction, signal installation, and other items of heavy civil work to rebuild the intersection at 56th Avenue and Pena Boulevard.

Aug 5, 2019

RFQ: Professional Design Services Connecting Auraria

Denver Public Works is seeking a design consultant to develop constructionready plans for the Larimer Bridge and Streetscape Project. Design will include the replacement of the aging bridge structure over Cherry Creek on Larimer Street between Speer and 14th Street in Downtown Denver. The design will also include streetscape enhancements on Larimer Street between 14th Street and the Auraria Campus.

Jul 31, 2019

RFQ: CM/GC Services DPL Central Library Renovations

The City and County of Denver (City) is soliciting Requests for Qualifications from qualified firms to provide Construction Management/General Contracting services to renovate the Denver Central Library, located at 10 W. 14th Ave, Denver, CO 80204. The renovations will focus on the lower floors primarily with some improvements and deferred maintenance throughout the building. The building must remain open for business through construction. Should the City choose to continue to work with the selected firm through the construction phase, then a separate CM/GC agreement will be signed.

Jul 22, 2019

RFQ: On-Call Engineering Services

The City and County of Denver Department of Public Works (DPW) is rapidly implementing multimodal projects the concept of completing an entire network within smaller areas of the City, a process the planning team around has called the “Community Network” approach. This approach will provide a combination of multimodal projects, ped, bike, transit, vision zero. The intent of network implementation is to meet our modal goals of 30% mode shift and reduction to 50% single occupancy vehicle (SOV). The intent of this contract is to hire a Design Consultant to provide design services for bikeway and multimodal projects within three Community Networks (see Map 1) and related projects citywide. It is the intent of DPW to award three contracts through this RFQ. Map 1 displays bikeway projects within the Community Networks and related projects citywide that require design services. “Plan” projects will complete a planning phase by a separate Planning Consultant resulting in an existing conditions analysis and preferred concept design. “Design” projects will require an existing conditions analysis and preferred concept design to be completed by the Design Consultant. The Design Consultant will prepare construction contract documents for all projects for a variety of delivery methods.