Skip navigation

Contract 201950258 Evergreen Lakehouse Bridge Replacement

General Statement of Work

Project bid package to include complete removal and replacement of the Evergreen Lakehouse Bridge over Bear Creek (Structure D-27-MP-070). The replacement bridge is a single span structure with precast (pre-stressed) concrete box girders and abutments founded on predrilled steel H-piles.

Estimated Construction Cost

Between $713,000.00 and $872,000.00

Statement of Quantities (PDF)

Pre-bid on 5/23/2019 at 11:00 a.m.

WEBB Building  

201 W Colfax Avenue

4th Floor Conference Room, 4.I.5.

Denver, CO 80202

Pre-Bid Sign-in Sheet (PDF)

Civil Rights Pre-Bid Reference Guide (PDF)

Questions Deadline

May 29, 2019 at 10:00 a.m. local time

Bid Opening on 6/6/2019 at 11:00 a.m.

WEBB Building

201 W. Colfax Avenue

6th Floor Conference Room 6.G.7

Denver, CO 80202

Plans Available May 16, 2019

Digital Download

QuestCDN Project #6342036

Plan Cost   $15.00

DBE goal:  5%

Prequalification

None

Contract Administrator

Diane Mora

diane.mora@denvergov.org 

FOR COMPLETE DESCRIPTION SEE AD IN The Daily Journal ON THE FOLLOWING DATES

Thursday May 16, 2019

Friday May 17, 2019

Monday May 20, 2019