Skip navigation

Contract 201950316 General Storm - Valverde

General Statement of Work

The Valverde storm project will improve drainage conditions in Basin 0064-02 by installing a 42" diameter storm pipe in W. Alameda Ave. and abandoning an existing undersized drainage system consisting of failing corroded metal pipe outside of the City ROW without easements. The project will convey storm water from the sumps on Decatur St., Dale Ct., and Clay St., to W. Alameda Ave. The 42" storm pipe will tie into the existing storm system near Bryant St. Other areas of work include water utility relocations, restoration of paving, landscaping and flatwork where storm system construction impacts existing improvements.

Estimated Construction Cost:  Between $4,000,000 and $4,400,000.

Statement of Quantities (PDF)

Pre-Bid Conference: June 3, 2019 at 10:00 a.m. local time, 201 W. Colfax Ave. Denver, CO 80202. Conference room 4.I.4.

Sign-in Sheet (PDF)

Question Deadline: June 10, 2019 at 10:00 a.m.

Bid Opening Date: June 27, 2019, 11:00 a.m.

Room 6.G.7

201 W. Colfax Avenue

Denver, CO  80202

Plans Available May 22, 2019

Digital Download

QuestCDN Project #6354359

Plan Cost $15

Contract Administrator: Dani Abbott

Phone: 720-913-4508

M/WBE goal: 15%

Prequalification Required:  Category 1E4 (Piped Sewer) at the $6M level

For complete description see Ad in The Daily Journal on the following dates:

May 22, 23, 24, 2019