Contract 201950389 27th Street Storm Interceptor Phase 2

General Statement of Work

The 27th Street Interceptor Project will improve drainage conditions in Basin 0062-1 by utilizing an existing 108" diameter storm system approximately 200' west of the 27th St. and Blake St. intersection in the Coors Field Parking lot. Phase 2 extends from the 27th and Arapahoe St southeast to 27th and Welton St. construction includes open cut of large diameter storm sewer and its associated facilities.

Addendum #1 (PDF)

Addendum #2 (PDF)

Addendum #3 (PDF)

Addendum #4 - Bid Postponement Notice (PDF)

Addendum #5 (PDF)

Estimated Construction Cost

Between $4,900,000.00 and $5,400,000.00

Statement of Quantities (PDF)

Pre-bid on 06/5/2019 at 11:00 a.m.

Webb Building  

201 W. Colfax Ave.

4th floor, Room 4.I.4.

Denver, CO 80202

Sign-in Sheet (PDF)

Questions Deadline

June 13, 2019 at 10:00 a.m. local time

NEW DATE: Bid Opening on 07/18/2019 at 11:00 a.m.

WEBB Building

201 W. Colfax Avenue

6th Floor Conference Room 6.G.7

Denver, CO 80202

Plans Available May 29, 2019

Digital Download

QuestCDN Project #6359732

Plan Cost    $15.00

M/WBE goal:  15%

Prequalification

1(E)4 Piped Sewer at or above the $6,000,000.00 level

Contract Administrator

David Relaford

david.relaford@denvergov.org

FOR COMPLETE DESCRIPTION SEE AD IN The Daily Journal ON THE FOLLOWING DATES

Wednesday, May 29, 2019

Thursday, May 30, 2019

Friday, May 31, 2019