Contract 201950653 Traffic Signal Upgrade Mill Levy Pkg 13

General Statement of Work

To rebuild 5 traffic signals located within a major arterial corridor to enhance signal visibility and address safety issues. The locations of these signals are at: 9th Ave & Downing St; 7th Ave & Downing St; Virginia Ave & Downing St; Kentucky Ave & Downing St; Louisiana Ave & Downing St. The traffic signal upgrade construction scope of work includes the removal and replacement of the outdated and aging traffic signals with a current CCD standard mast arm traffic signals. This includes new 12" signal indications, 16" countdown pedestrian faces, ATC controller and backup UPS, infrared vehicle detection systems, emergency pre-emption system, close circuit TV to monitor traffic, and Ethernet switch for communication. Other scope of work in this project include new civil construction (i.e. ADA compliance curb ramps/curb returns, sidewalks, curb/gutter and storm sewer improvements), new sign package, and paint/pavement marking package for all 5 locations.

Estimated Construction Cost

Between $1,370,000.00 and $1,670,000.00

Statement of Quantities (PDF)

Addendum #1 (PDF)

Addendum #2 - Bid Date Postponement (PDF)

Pre-bid on 6/27/2019 at 1:00 p.m.

WEBB Building  

201 W Colfax Avenue

4th Floor Conference Room, 4.I.5.

Denver, CO 80202

Sign-in Sheet (PDF)

Questions Deadline

July 8, 2019 at 10:00 a.m. local time

Bid Opening on 7/18/2019 at 11:00 a.m.

WEBB Building

201 W. Colfax Avenue

6th Floor Conference Room 6.G.7

Denver, CO 80202

Plans Available June 17, 2019

Digital Download

QuestCDN Project #6394420

Plan Cost   $15.00

M/WBE goal:  15%

Prequalification

1D(1) Traffic Signals at or above the $3,000,000.00 monetary level

Contract Administrator

Diane Mora

diane.mora@denvergov.org

FOR COMPLETE DESCRIPTION SEE AD IN The Daily Journal ON THE FOLLOWING DATES