Skip navigation

Contract 201950758 2015 Traffic Signal Upgrade - Mill Levy 9

This is the 2015 Traffic Signal Upgrade – Mill Levy Package #9 project. The overall objective of this project is the redesign and reconstruction of eight (8) traffic signals within the City and County of Denver. The locations of these traffic signals are at the following intersections:

1. 17th Ave & Sherman St

2. 17th Ave & Grant St

3. 17th Ave & Logan St

4. 17th Ave & Washington St

5. 17th Ave & Clarkson St

6. 17th Ave & Franklin St

7. 17th Ave & Williams St

8. 16th Ave & Downing St

In addition to the traffic signal improvements, there will be improvements made to curb ramps, sidewalk, curb and gutters, curb returns, storm sewer inlets and manholes at each intersection for enhanced pedestrian access as necessary. Ramp improvements will be designed and constructed to current CCD standards and specifications. In addition, there may be additional damaged sidewalks, curb and gutter and curb returns adjacent to the ramps that will need to be upgraded. Existing storm sewer inlets and manholes at the intersections may also require relocation or resetting.

Estimated Construction Cost:

Between $2,150,000.00 and $2,600,000.00

Statement of Quantities (PDF)

Pre-Bid Meeting on 7/9/2019 at 1:00 p.m.

WEBB Building     

201 W Colfax Avenue

4th Floor Conference Room, 4.I.4.

Denver, CO 80202

Sign-in Sheet (PDF)

Questions Deadline:

July 15, 2019 at 10:00 a.m. local time

Bid Opening on July 25, 2019 at 11:00 a.m.

WEBB Building

201 W. Colfax Avenue

6th Floor Conference Room 6.G.7

Denver, CO 80202

Plans Available June 24, 2019

Digital Download

QuestCDN Project #6407400

Plan Cost: $15.00

M/WBE Goal: 13%

Prequalification Requirement: 1D(1) Traffic Signals at or above the $3,000,000.00 monetary level

Contract Administrator:

Jennifer Clark

Jennifer.clark@denvergov.org 

For complete description, see ad in The Daily Journal on the following dates:

Monday, June 24, 2019

Tuesday, June 25, 2019

Wednesday, June 26, 2019