Skip navigation

Contract 201950871 TSSIP 16, 17, 18 Cabinet Upgrade

General Statement of Work

The overall objective of this project is to upgrade all signal cabinets in the Denver Central Business District (CBD) and upgrade all components inside of the cabinet.  The following work is anticipated by the City at all project locations: change-out controller cabinets and bases; install traffic controllers; install uninupted power supply; install malfunction management units; install Ethernet switches; replace pull boxes; allocate or re-allocate existing fiber optic interconnect cable at the intersections.

Addendum #1 (PDF)

Estimated Construction Cost

Between $1,160,000.00 and $1,410,000.00

Statement of Quantities (PDF)

Pre-bid on 7/11/2019 at 1:00 p.m.

WEBB Building  

201 W Colfax Avenue

6th Floor Conference Room, 6.E.1.

Denver, CO 80202

Sign-in Sheet (PDF)

Questions Deadline

July 17, 2019 at 10:00 a.m. local time

Bid Opening on 8/1/2019 at 11:00 a.m.

WEBB Building

201 W. Colfax Avenue

6th Floor Conference Room 6.G.7

Denver, CO 80202

Plans Available July 1, 2019

Digital Download

QuestCDN Project #6418260

Plan Cost   $15.00

DBE goal:  10%

Prequalification

1(D)1 TRAFFIC SIGNAL at or above $1.5M monetary level

Contract Administrator

Diane Mora

diane.mora@denvergov.org 

FOR COMPLETE DESCRIPTION SEE AD IN The Daily Journal ON THE FOLLOWING DATES

Monday July 1, 2019

Tuesday July 2, 2019

Wednesday July 3, 2019