Contract 201951453 Lindsey Flanigan Courthouse Courtroom Buildouts

General Statement of Work

The Lindsey Flanigan Courthouse (“the Courthouse”) Courtroom Buildouts will include the construction of new courtrooms, jury deliberation rooms with restrooms, judge’s chamber with restrooms, holding areas including cells, visitation rooms, and conference rooms all within existing shell spaces inside the Courthouse. These shell spaces include much of the infrastructure for mechanical, electrical, and plumbing systems. Limited demolition will be required as a result. Furniture, fixtures, and equipment (FF&E) composed of audio visual and network systems as well as furniture will also be included. Each courtroom will require custom millwork and acoustic wall treatments.

Addendum #1 (PDF)

Estimated Construction Cost

Between $3,449,545.00 and $3,812,655.00 

Pre-Bid on September 9, 2019 at 9:00 a.m.

WEBB Building

201 W Colfax Ave.

4th Floor, Conference Room 4.I.5

Denver, CO 80202

Sign-in Sheet (PDF)

Optional Site-Visit: September 19, 2019 at 9:00 a.m.

Lindsey Flanigan Courthouse

520 W. Colfax Ave.

Denver, CO 80204

*Note: Allow enough time to go through security

Questions and Answers Period Extension - Now Due:

September 24, 2019 at 10:00 a.m. local time

Bid Opening: October 3, 2019 at 11:00 a.m.

Bid Opening on September 26, 2019 at 11:00 a.m.

WEBB Building

201 W Colfax Ave.

6th Floor, Conference Room 6.G.7.

Denver, CO 80202

Plans Available August 28, 2019

Digital Download

QuestCDN Project #6479932

Plan Cost: $15.00 

M/WBE Goal: 18% 

Prequalification

2B-General Building Occupied Buildings or 2C-Active High Security Facility Renovation at or above the $6,000,000 monetary level 

Contract Administrator

Regina Diaz